Attachment 4- Traffic Impact Assessment
21 November 2023
SLR Project No.: 620.V30926
Stockwell Development Group Pty Ltd SLR Ref No.: 620.V30926-R01 VMU TIA v1.0
Noosa Village Mixed Use Development 20231121.docx
The operation of the intersections within the identified impact assessment area have been
assessed for the Thursday PM and Saturday midday peaks.
9.5 Intersection Assessment
9.5.1 I1: Hofmann Drive / Emporium Drive
The Hofmann Dr / Emporium Dr Roundabout is an existing 3-leg roundabout. The existing
layout and SIDRA assessed intersection form are shown in Figure 16. The results of the
SIDRA assessment are presented in Table 29. Detailed SIDRA outputs are provided at
Appendix E.
Figure 16 I1: Hofmann Drive / Emporium Drive – Existing and SIDRA Assessed Form
Table 29 I1: Hofmann Drive / Emporium Drive – SIDRA Outputs
Weekday PM Peak Saturday PM Peak
Scenario Critical Delay th
95 %ile Critical Delay 95th %ile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
Baseline
2023 0.46 13 24 0.59 17 42
2026 0.49 13 27 0.62 18 48
2036 0.64 16 49 0.72 22 67
Baseline with Development
2026 0.59 15 41 0.73 21 68
2036 0.75 19 74 0.83 27 100
The results of the analysis summarised in Table 29 shows that the existing intersection form
is expected to perform within the adopted performance thresholds for all assessed scenarios.
9.5.2 I2: Hofmann Drive / Noosa Civic Loop Road
The Hofmann Drive / Noosa Civic Loop Road is an existing 3-leg roundabout. The existing
layout and SIDRA assessed intersection form are shown on Figure 17. The results of the
SIDRA assessment are presented in Table 30. Detailed SIDRA outputs are provided at
Appendix E.
36
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 4- Traffic Impact Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.