Council archive · source document
Updated Stormwater Management Plan · 132007.1841.7
Attached to the e-mail Further response to information request - 132007.1841.7.
Plans and drawings: the text below has words only, no drawings.
necessary to attenuate the discharge to the existing drainage reserve to pre-development levels.
Pre- and post-development calculations are shown below, with the required detention storage
(maximum volume developed at the ARI 100-year event) of 12m3 accommodated within pipe, pit
and depression storage discharging to the existing downstream chamber. The maximum depth of
the inundated area will be 150mm.
Table 1 – IFD table for Noosaville (Bureau of Meteorology)
Actrol Noosaville
STP17-0504
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Updated Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.