Council archive · source document
Updated Stormwater Management Plan · 132007.1841.7
Attached to the e-mail Further response to information request - 132007.1841.7.
Plans and drawings: the text below has words only, no drawings.
Table 2 – Pre- and post-development runoff and detention calculations
The 100-year Inflow-Outflow-Storage hydrographs are shown below in Figure 3 and refine the required
storage volume to 12m3. Maximum outflow from the system will be limited to 0.073m3/s by a 300mm diameter
outlet pipe from the last inlet pit to the downstream chamber.
Actrol Noosaville
STP17-0504
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Updated Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.