Council archive · source document
Updated Stormwater Management Plan · 132007.1841.7
Attached to the e-mail Further response to information request - 132007.1841.7.
Plans and drawings: the text below has words only, no drawings.
Figure 3 – Inflow-Outflow-Storage hydrographs for 1 in 100-year event
Storage will comprise of 52m of 450mm pipe, two 600x600 pits at 1.5m deep and 98m2 of depression storage
around the lowest inlet pit (area shown shaded on layout plan in Appendix B).
3.0 Stormwater Quality
3.1 Requirement
In accordance with State Planning Policy, a Stormwater Quality Management Plan is not required for sites
less than 2,500m2 in area.
Actrol Noosaville
STP17-0504
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Updated Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.