ORDINARY MEETING MINUTES 18 JUNE 2020
Plan No. Rev. Plan/Document Name Date
NRA-05133C18- E B&FP Boat Shed – Proposed Elevations 3/10/2019
DA-4000 N&E (renderings), prepared by nra-co-lab
NRA-05133C18- E B&FP Boat Shed – Proposed Elevations 3/10/2019
DA-4001 S&W, prepared by nra-co-lab
NRA-05133C18- - West Site elevation, prepared by nra-co-lab 3/10/2019
DA-4005.1
LA1810001-100 A Coversheet and Planting Schedule, 28/02/2019
prepared by Cardno (as annotated by
Council)
LA1810001-110 A Landscape Plan, prepared by Cardno 28/02/2019
LA1810001-200 A Landscape Details, prepared by Cardno 28/02/2019
Currency Period
3. The Currency Period for this development approval lapses if the use has not
happened by 18 June 2026 unless an application to extend the currency period is
approved by Council.
Building Height
4. The maximum height of the development must not exceed the maximum height as
reflected in the approved plans with respect with the finished ground level and the
natural ground level.
Access and Parking
5. No parking is allowed on the driveway of the adjacent Noosa River Holiday Park
site.
Building Appearance
6. The development must be finished with subdued/muted external building colours,
as shown on the approval plans.
7 Roof materials must be non-reflective to minimise the visual impact of the
development.
8. Any fencing must be designed and be of a colour that blends with the environment
and complements the building design.
9. Any waste bins or air conditioning units must be suitably screened so they are not
visible externally to the site.
Lighting
10. External light sources utilised on site are limited to an external light outside the
front door of the facility and a single dock light, used for a maximum for 30 minutes
during operation start and finish times outside of daylight hours.
Stormwater
11. All stormwater run-off from the new works is to be connected to the existing on-site
drainage system.
DEMOLITION
Works
12. Any demolition works must be undertaken in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust
or odours) nuisance or any other emissions in accordance with the nuisance
provisions of the Environmental Protection Act 1994.
Page 21 of 26