Skip to the record
Accept no imitations.

Original source · versioned page text

2020-06-18 Ordinary Meeting Minutes

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES                                                          18 JUNE 2020


        Waste management
        13. A Waste Management Plan (demolition) must be submitted in accordance with
            Planning Scheme Policy 11 - Waste Management Plan and approved by Council’s
            Waste Coordinator prior to issue of a development permit for Building Works for
            demolition, removal or relocation.
             The purpose of the Waste Management Plan is to facilitate the segregation of
             waste for the effective reuse and recycling of such materials. Segregated wastes
             attract significantly reduced disposal fees at the landfill with some items free.
             Higher gate fees are charged for mixed waste.
             Waste storage areas must provide for adequate separation of all reusable,
             recyclable and waste materials. These must be located so that they are convenient
             and safe to use.
             The Plan must contain the following information:
             a.    The areas for the storage and separation of waste shown on a site plan;
             b.    A waste management table as indicated below is to be completed showing
                   how waste material is to be segregated - recycled – reused or disposed; and
             c.    Table – Waste Management Table

         MATERIALS ON-SITE              DESTINATION
                                        Re-use and Recycling                    Disposal
         Expected waste    Estimated    On-site            Off-site             *specify
         materials         volume(m³)   *specify proposed *specify contractor   contractor and
                                        re-use or on-site and       recycling   landfill site or
                                        recycling methods  outlet               other disposal
                                                                                site
         Excavation
         material
         Green waste
         Bricks
         Concrete
         Timber-please
         specify
         Plasterboard
         Metals - please
         specify
         Asbestos
         Other - please
         specify
        Note * If a demolition contractor is undertaking works, then the Waste Management table
        is to be completed by the demolition contractor.
        Damage to infrastructure
        14. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
            channel, bridges or roadways must be repaired or reinstated to at least pre-existing
            conditions.
        Litter, erosion and sediment control
        15. Litter, erosion and sediment control measures must be installed and maintained
            until soils are stabilised by turf, vegetation or sealed.
             Note: it is an offence under the Environmental Protection Act 1994 to deposit or
             potentially allow litter, waste, soil, or other contaminants to enter a waterway or
             storm water drainage system (e.g. roadside gutter).


                                                                                Page 22 of 26
Log in to download the original file

2020-06-18 Ordinary Meeting Minutes(PDF, 723KB).pdf · 740 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.