ORDINARY MEETING MINUTES 18 JUNE 2020
Landscaping Works
16. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that
specific area and must include in particular:
a) the works shown on the Approved Landscape Plans (as amended);
b) the removal of the existing Cocos Palm, and the planting of Archontophoenix
cunninghamiana (Bangalow Palm) either 200L or ex-ground, and guyed
(staked) sufficiently in accordance with horticultural standards; andc)
dense landscaping to screen the bulk and scale of buildings from residences
on Russell Street and the Noosa River Holiday Park.
17. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
18. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
OPERATIONAL WORKS
Landscaping Works
19. Landscape works must be supervised, undertaken and certified by qualified
persons*. All works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
20. Where damage occurs to any Council asset as a result of the development works,
it must be repaired immediately where it creates a hazard that presents risk to
person or property. Other damage must be repaired prior to completion of works.
21. Landscape works must:
a) Comply with the approved landscape plan (as annotated).
b) Ensure amenity or sales signage and ancillary infrastructure is not installed
within the road reserve.
c) Ensure permanent irrigation is not installed within the road reserve.
d) Ensure mulch is aged, comprised of leaf and limb material of varying sizes,
free of foreign matter including anthropogenic waste, rock, soil/sediment
contamination and is applied to all planting areas to ensure a minimum
100mm depth once settled.
B. Find the following matters relevant to the assessment and sufficient reason to approve
the application:
1. The proposal upgrades facilities that are dependent on direct access to the Noosa
River in order to maintain public safety.
2. The proposed works do not intensify the existing operation, within the coastal
management district and riparian buffer area.
3. The proposal is consistent with the zoning (Community Facilities zone) in the draft
Noosa Plan.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 23 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.