Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 103, section 1. The text section number identifies this passage in the reader.
CSR West Ridge Quarry
Ecological Assessment Report
Column 1 Column 2 Assessment of Impacts and Recommendations
Specific outcomes Probable solutions (if code
assessable)
of local origin— retained and embellished to a fragmentation of existing vegetated areas and wildlife corridors present around the quarry. In addition, the
a) along watercourses, minimum width of 100m. proposed rehabilitation works at Neales and White Pit Quarries will provide vegetative coverage of the currently
drainage lines and exposed quarry pits and improve the corridor values of these significantly larger areas (i.e. approximately 5ha).
ridgelines; and The proposed works would achieve Specific Outcomes 08.
b) as linkages between
areas of remnant
vegetation, including—
i. across property
boundaries;
ii. to areas of national park,
conservation park, State
forest or reserve; and
iii. into adjoining local
government areas.
Excerpt from The Noosa Plan Map 4. Open Space Networks showing the site is not within a recognised “Open Space Corridor”
Scenic amenity S9.1 and S10.1 Vegetation is With regard to S9.1 and S10.1, the proposed works do not require the removal of vegetation—
O9 The scenic amenity and retained and enhanced— a) within 30m of prominent ridgelines and hillslopes;
vegetated character of the a) within 30m of prominent b) in gullies;
locality and its ridgelines and c) along watercourses or drainage lines (as recognised on OM3.1 and 3.3); or
watercourses, drainage hillslopes;
lines, sloping land and d) within 10m of road reserves.
b) in gullies;
ridgelines is retained and
c) along watercourses and
CSR Building Products Ltd Version 3 4 December 2012
Ecological Assessment Report V3.docx Commercial in Confidence Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.