Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 105, section 1. The text section number identifies this passage in the reader.
CSR West Ridge Quarry
Ecological Assessment Report
Column 1 Column 2 Assessment of Impacts and Recommendations
Specific outcomes Probable solutions (if code
assessable)
and values. have resulted in small localised stockpile areas (with steep sides) within the proposed disturbance areas. The
proposed works would regrade these former stockpile areas, along with the quarry pit to form gently sloping land.
Following re-grading, the West Ridge quarry will be rehabilitated in accordance with its Plan of Operations prior
to the surrender of the mining lease over West Ridge Quarry. The extent and nature of the rehabilitation works
will be determined at the time of quarry closure with consideration to the likely post mining land uses for the land.
Minimum works would include establishment of stable land with grass cover for grazing purposes.
Further, CSRs PoO documents that, as a standard procedure mining operations in new areas will be planned
and executed in a manner which leaves no extraction or fill embankment batter at a slope angle of steeper than
20 degrees.
The proposed work achieves O13.
Engineering and site S14.1 Works, including roads, As discussed the proposed works do not require the establishment of permanent infrastructure, and the works
works driveways, fences, sewer lines would not traverse or fragment vegetation nor create barriers to faunal movement. With reference to the
O14 Development is sited and other infrastructure— Probable Solutions:
and designed to— a) do not transect areas of
vegetation; or S14.1 – works do not include establishment of infrastructure, existing quarry infrastructure will be used where
a) provide adequate necessary.
separation distance b) are co-located within a
between the vegetation to combined utility corridor; and
be protected and the c) provide for fauna underpasses, S14.2 – the establishment of fauna friendly fencing would not be necessary or appropriate for the temporary
development to avoid speed reduction devices and proposed disturbance.
disturbing, destabilising associated fencing, lighting and
and deoxygenating any warning signs, where appropriate; S14.3 and S14.4 – it would be appropriate for SCRC to require a CEMP (or similar) be prepared prior to
tree or altering the commencement of site operations to address clearing or construction activities including:
drainage; a) clearly marking vegetation to be retained with flagging tape;
AND
b) avoid traversing or b) installing protective fencing around the dripline of the vegetation and avoid filling and excavation in
fragmenting vegetation or S14.2 Development within or
adjacent to areas of vegetation, these fenced areas;
habitats for significant flora
incorporate fauna friendly fences; c) ensuring stock piling, storage and vehicle parking occur outside the identified vegetation areas; and
and fauna species; and
c) avoid creating barriers to d) use of low impact construction techniques around vegetation to minimise interference with the
AND vegetation.
faunal movement.
S14.3 Vegetation is protected
from interference resulting from Provided the construction works are undertaken in a considerate manner as listed above, the proposed work
clearing or construction activities would achieve O14.
by—
a) clearly marking vegetation to be
retained with flagging tape;
b) installing protective fencing
around the dripline of the
CSR Building Products Ltd Version 3 4 December 2012
Ecological Assessment Report V3.docx Commercial in Confidence Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.