Column 1 Column 2 Assessment of Impacts and Recommendations
Specific outcomes Probable solutions (if code
assessable)
vegetation and avoid filling and
excavation in these fenced areas;
and
c) ensuring stock piling, storage
and vehicle parking occur outside
the identified vegetation areas;
AND
14.4 Low impact construction
techniques are used around
vegetation to minimise
interference with the vegetation.
Filling and excavation No solution provided. The hydrological regime would be altered by the proposed works, but in a manner that returns hydrological flows
O15 Vegetation is not to reflect the pre-quarry conditions. Current ground levels were used to determine which areas surrounding the
adversely impacted upon quarry pit required reshaping to form a gently sloping land reflective of the surrounding landscape and indicative
by earthworks and of the former conditions. Reshaping the land at West Ridge will enable overland flow to drain across the site in a
changes to the more natural manner rather than pooling in the quarry pit.
hydrological regime,
including changes to Provided that potential downstream impacts from the works, such as discharge quality, are adequately controlled
ground water levels, the proposed extraction would not result in impacts to retained areas of vegetation in the vicinity.
flooding levels, run-off and
tidal hydraulics.
13.10 Vegetation management
Replanting and S16.1 Landscaping complements A very small total area (i.e. 1.4ha) supporting ‘Regenerating Open Forest’ is proposed to be affected by the
rehabilitation and supports important habitats works. As discussed, the proposed works serve the dual purpose of:
O16 Vegetation is by— 1) enabling rehabilitation of Neales Quarry and White Pit Quarry over an area of approximately 5ha; and
enhanced through the a) utilising native plants of local 2) enabling reshaping of land affected by quarrying at West Ridge Quarry through the formation of gently sloping
following measures: origin; ground levels reflective of surrounding areas.
a) siting landscaped areas b) utilising suitable plant species
to complement and identified in PSP3 – Landscaping Under the PoO for the Cooroy quarries, rehabilitation is planned and executed as areas become available (i.e.
enhance existing Plants and Guidelines; when mining is concluded in each area). Rehabilitation, when carried out, is of a form and extent reflecting
vegetation; c) replicating adjacent remnant appropriate post mining landform/landuse requirements. The rehabilitation at Neales Quarry and White Pit
b) removal of all species habitats, including understorey Quarry will provide native vegetative coverage over the exposed quarry pits and improve the habitat and corridor
likely to displace native vegetation; values of this significantly larger area. As part of the rehabilitation, local origin native vegetation would be
flora species or degrade d) creating or enhancing linkages established.
fauna habitat; between existing habitats;
CSR Building Products Ltd Version 3 4 December 2012
Ecological Assessment Report V3.docx Commercial in Confidence Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.