Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 107, section 1. The text section number identifies this passage in the reader.
CSR West Ridge Quarry
Ecological Assessment Report
Column 1 Column 2 Assessment of Impacts and Recommendations
Specific outcomes Probable solutions (if code
assessable)
c) replanting and e) avoiding the use of Undesirable As a minimum, West Ridge Quarry would be rehabilitated in the following manner to ensure the establishment of
rehabilitating degraded Plant Species listed in Table 9.1 stable land with grass cover for grazing purposes.
habitat; and of PSP3 Landscaping Plants and Minor trim earthworks to void the pit perimeter and floor.
d) replacing any vegetation Guidelines; and
Spreading of soil from perimeter stockpiles.
removed with suitable f) planting riparian zones to filter
replacement vegetation of stormwater run-off and provide for Ripping, seeding and fertilising with grass seed.
local origin. wildlife habitat;
Rehabilitation activities form part of the standard operations under the mining lease. Rehabilitation strategies
AND and plans are documented and translated into operational procedures and/or work instructions for effective
implementation. Pursuant to the PoO, monitoring and records of rehabilitation outcomes are maintained.
S16.2 Vegetation removed is
replaced with— With quarry operations such as this, often minimal or no rehabilitation is able to be carried out for a period of time
a) the equivalent number of trees while the quarry is active, followed by periods of relatively intense rehabilitation. As such, forward planning and
or plants of local origin; or execution of rehabilitation annually is often not possible or practical. Due to the potential time lag for
b) twice the number of trees or rehabilitation at West Ridge Quarry, SCRC may wish to regulate the rehabilitation through Conditions linked to
plants of local origin. specifications of the existing mining lease and PoO.
Fire management No solution provided The proposed works (i.e. extraction works with no permanent infrastructure) do not require fire management
O17 Fire management measures to implement.
measures are adopted
based on ecological
principles, which—
a) maintain and enhance
biodiversity;
b) minimise threat of fire to
the natural environment,
life and property; and
CSR Building Products Ltd Version 3 4 December 2012
Ecological Assessment Report V3.docx Commercial in Confidence Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.