CSR Building Products Limited Page 9
West Ridge Quarry
Site Based Management Plan
Table 7 - Continued
Impacts
Spread of Declared
and
Land contamination
Air Quality (Dust)
Activity
Visual Amenity
Fauna & Flora
Stormwater &
Groundwater
soil erosion
Heritage
Cultural
Waste
Plants
Noise
Equipment
Bulldozer Low Low Low Low Low Low Low Low Medium Medium
2x2=4 1x1=1 2x2=4 2x1=2 2x1=2 2x1=2 2x1=2 1x1=1 3x2=6 3x2=6
Front End Loader(s) Low Low Low Low Low Low Low Low Medium Low
2x2=4 1x1=1 2x2=4 2x1=2 2x1=2 2x1=2 2x1=2 1x1=1 3x2=6 1x1=1
Haul Truck(s) Low Low Low Low Low Low Low Low Low Low
2x1=2 1x1=1 2x2=4 2x1=2 2x1=2 2x1=2 3x1=3 1x1=1 2x2=4 1x1=1
Screening Plant Low Low Low Low Low Low Low Low Low Low
2x2=4 1x1=1 2x2=4 2x1=2 2x2=4 2x2=4 2x1=2 1x1=1 2x2=4 1x1=1
Excavator(s) Low Low Low Low Low Low Low Low Medium Medium
2x2=4 2x2=4 2x2=4 2x1=2 2x1=2 2x1=2 2x1=2 1x1=1 3x2=6 3x2=6
Product Delivery Truck(s) Low Low Low Low Low Low Low Low Low Low
2x2=4 1x1=1 1x2=1 3x1=3 2x1=2 2x1=2 3x1=2 1x1=1 2x2=4 1x1=1
Service/Light Vehicles Low Low Low Low Low Low Low Low Medium Low
2x1=2 1x1=1 1x2=1 2x1=2 2x1=2 2x1=2 2x1=2 1x1=1 3x2=6 1x1=1
1.6 Purpose of the Site Based Management Plan
The Site Based Management Plan (SBMP) is a management document which links the potential environmental impacts
with commitments and measures to safeguard the environment. It is the principal management tool for guiding
environmental management at the Site. The SBMP provides the framework for environmental management at the Site and
is a practical guide at the operational level to prevent or minimise environmental impacts. This SBMP has been designed
in accordance with EHP guideline EM1071 v1 “Site-based management plans”.
1.7 Scope and Format of the Site Based Management Plan
The SBMP consists of a number of self-contained sections to provide ready reference, ready filing and easy access to
information for managing the Site and Site activities. It comprises Environmental Impact Identification and Assessment,
Environmental Management Strategies, Reference Files, Monitoring Records, Incident Protocols, Complaint Settling
Protocols and Record Sheets.
Environmental management is a dynamic process and needs to respond to new technologies and scientific advances. The
SBMP has been designed to be modified in response to monitoring results, changing circumstances (technological,
economic or social), changing legislation (statutory requirements), operational experiences, design trials and community
expectation.
The SBMP attempts to concisely describe the commitments made for environmental management by:
identifying aspects of the Project that require environmental management;
establishing practical and achievable measures for the containment of environmental impacts to acceptable levels;
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.