Skip to the record
Every meeting, every word.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 194, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                          Page 10
West Ridge Quarry
Site Based Management Plan


      identifying authority and responsibility for implementing management measures during construction, operational and
      decommissioning stages of the development;
      nominating acceptable performance criteria for the measuring of impact levels and any sources from which the criteria
      may have been derived, including legislative requirements and government policies;
      describing courses of action and responsibilities (contingency plans) for responding to incidents of non-compliance
      and emergency events which may be detected or arise; and
      establishing procedures for monitoring and reporting.

Environmental Management Strategies set out the:
      environmental policy which provided the framework for the preparation of the SBMP;
      organisational and management structure; and
      environmental objectives/goals providing the basis for environmental management measures.

The SBMP has been developed for environmental elements that have been identified to pose a potential risk to the
surrounding environment in relation to the Site and Site activities. These environmental elements include:
      Stormwater, Erosion and Sediment Control
      Air Quality (Dust)
      Noise
      Hydrocarbon And Chemicals
      Waste
      Weeds
      Bushfire
      Landcare And Rehabilitation
      Cultural Heritage
      Emergency and Incident Management

The structure of the SBMP comprises a series of procedures for ease of implementation. The elements of the SBMP are
based on a standard format (that may be adapted for a particular issue or activity) as follows:
      Purpose
      Operational Policy
      Performance Targets
      Implementation Strategy/Mitigation Measures
      Monitoring
      Auditing and Review
      Reporting and Responsibility
      Identification of Incident or Failure to Comply
      Contingency Plans

Copies of reference documents for this operation such as the Development Approval issued in accordance with the
Environmental Protection Act 1994 (EP Act) and the Sustainable Planning Act 2009 (SPA) conditions, shall be held in an
SBMP Documents Reference Folder along with any other relevant codes, protocols, work procedures, environmental
guidelines and action plans.

Monitoring records, inventories and registers of relevant items relating to this SBMP and Site operations will be included in
an SBMP Monitoring Records Folder. This may include items such as water monitoring records, air quality monitoring
records and public complaint record.

The SBMP shall provide the necessary basis for effective and efficient environmental management on the Site. It shall
direct the management of the Site and significant environmental issues by the implementation of “leading practice” industry
measures where appropriate.

1.8          Legislation
In Queensland the EP Act is the principal legislation for protecting the environment. The EP Act was assented on 1
December 1994 and was proclaimed on 1 March 1995. The object of the EP Act is to ‘protect Queensland’s environment



December 2012 / file ref. 1271_610_001                                                                      GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.