Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 199, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                                         Page 15
West Ridge Quarry
Site Based Management Plan



Table 8 - Monitoring Schedule

Item                              Aim                                    Responsible Person           Schedule
Complaints                        Resolution and Prevention              Company Director(s) /        As Received
                                                                         Site Manager
Stormwater, Sediment              Confirm integrity and operation of     Site Manager                 Monthly visual surveillance or prior
and Erosion Control               water conveyance structures and                                     to and following major rainfall events
                                  containment of surface waters from                                  (>25mm within 24 hours)
                                  disturbed areas of the Site
                                  Confirm area around refuelling and     Site Manager                 Monthly visual surveillance
                                  chemical stores are free of spills
Surface Water Quality             Confirm onsite containment of          Operators /                  Visual surveillance prior to and
                                  surface water from on-site disturbed   Site Manager                 following major rainfall events
                                  areas (no release strategy)                                         (>25mm within 24 hours)
                                  Confirm effective operation of         Site Manager                 Prior to any controlled release event
                                  extraction pit/sediment basin/trap
                                  systems
                                  Confirm receiving waters are not       Site Manager / Consultant    Following Complaint or a request
                                  impacted by operations                                              from an administering authority
Airborne Dust                     Confirm adequacy of control            Site Manager                 Following Complaint or on request
                                  measures                                                            from the administering authority
Noise                             Confirm adequacy of control            Site Manager                 Following Complaint or request from
                                  measures                                                            the administering authority
Rehabilitation                    Assess progress and compliance         Site Manager                 Annually
                                  with Site Rehabilitation Plan
                                  Monitor performance                    Site Manager /               1 month after Planting
                                                                         Consultant                   3 months after Planting
                                                                                                      6 months after Planting
                                                                                                      12 months after Planting
                                                                                                      2 years after Planting
Weeds                             Prevent spread of weeds                Site Manager                 Visual inspection of machinery on
                                                                                                      deployment to the Site. Quarterly
                                                                                                      Inspection of the Site (minimum)
Waste Management                  Record of regulated wastes             Site Manager                 Event
                                  disposed off-site
                                  Waste stored in appropriate                                         Weekly
                                  containers and waste receptacles
                                  labelled correctly
Bushfire                          Confirmation of the adequacy of        Site Manager                 Annually
                                  controls implemented
Update Material Safety            Site Safety                            Shift Supervisor /           Event/Annual
Data Sheet Register                                                      Site Manager
Spill Response Stations           Confirm equipment is properly          Site Manager                 Quarterly or following use
                                  maintained
Maintenance                       Confirm maintenance and contract       Shift Supervisor /           Quarterly
                                  maintenance records are being          Site Manager
                                  maintained
Site Signage                      Confirm signage is maintained          Site Manager                 6 monthly
Site Entrance                     Confirm access is properly             Site Manager                 Daily Surveillance
                                  maintained and suitable for use
Visual Amenity                    To ensure visual exposure is           Site Manager                 Quarterly Surveillance
                                  controlled and minimised
Cultural Heritage                 Spotting for Cultural Material         Operator and/or Contractor   Visual observations during any initial
                                                                                                      ground disturbance work on-site
Demarcation       of              Confirm         compliance     with    Site Manager                 Quarterly and prior to each stage of
Extraction Limits                 development approval.                                               extraction
Development Works                 To limit disturbance                   Site Manager                 Prior to the works for each stage



2.6          Communication
Effective communication between operational staff, management and external stakeholders must take place on
environmental matters.


December 2012 / file ref. 1271_610_001                                                                                     GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.