CSR Building Products Limited Page 17
West Ridge Quarry
Site Based Management Plan
that person must, as soon as practicable, report the nature and circumstances of the event to the Site Manager and
Property Development Manager; and
Compliance with Development Approval and Other Statutory Requirements, whereby a person in the
performance of their duties for the conduct of the use shall do so in a manner which ensures that the provisions of any
relevant development approval, or permit and any other statutory permission or approval are complied with.
A brief training package detailing the importance of observing all environmental safeguards and outlining the potential
environmental impacts will be implemented for all personnel working on-site. This will be done:
at the commencement of employment as part of the Site Induction and Safety Procedures;
at least every 24 months thereafter; and
at any stage should there be a change in operational procedures.
A record of all employee training and/or inductions will be maintained.
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.