CSR Building Products Limited Page 21
West Ridge Quarry
Site Based Management Plan
Can provide some degree of turbidity control while the Buffer Zone remains unsaturated.
Sediment Fence – SF - W Type 1 sediment trap.
woven fabric Suitable for all soil types.
Long duration construction sites likely to experience several storm events.
3.1.4 Monitoring
The Site Manager shall carry out monthly surveillance of on-site water storages and treatment systems.
Site inspection of water storages and treatment systems shall be carried out by the Site Manager where practicable
prior to anticipated runoff-producing rainfall and immediately following the event.
The inspections should consider:
- condition of banks and batters;
- condition of inlet and outlet zones, including structure integrity, possible clogging, excessive sediment deposition
or erosion;
- pollutant levels within any treatment devices; and
- weed infestation.
Prior to a release event from the quarry pit voids, the Site Manager shall arrange water samples to be collected for
laboratory analysis at the monitoring frequency and locations provided in Table 13 – Water Monitoring Frequency
and Locations.
Table 13 – Water Monitoring Frequency and Locations
Parameter Location Monitoring Frequency
Turbidity 1, 2 and 3
Suspended Solids 1, 2 and 3
Prior to discharge
pH 1, 2 and 3
Visual Oil & Grease 1, 2 and 3
The Site Manager may engage the services of a suitably qualified and experienced person to conduct the water
quality sampling and review monitoring results to provide advice in relation to the water quality management if a
complaint is received or if requested by the administrating authority.
Any surface water sampling will be undertaken in accordance with The Department of Environment and Heritage
Protection (EHP) Monitoring and Sampling Manual, September 2009 or subsequent editions.
3.1.5 Audit and Review
The effectiveness of the stormwater, erosion and sediment control management strategies will be reviewed
periodically and at least once every three years.
3.1.6 Reporting and Responsibility
Complaints or incidents regarding stormwater are to be reported to the Site Manager as soon as practicable and
recorded on the complaint register.
The Site Manager shall maintain a record of surveillance monitoring of on-site water storages and treatment systems,
of any corrective actions taken and complaints or incidents reported.
Records including results of any monitoring program undertaken on-site and complaint or incidents will be kept for a
minimum of five years for inspection by relevant statutory authorities.
3.1.7 Identification of Incident or Failure to Comply
Significant soil erosion evident within disturbed areas following rainfall events.
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.