Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 212, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                                  Page 28
West Ridge Quarry
Site Based Management Plan


      -      conducting refuelling of on-site equipment within a controlled environment, where practical, or using drip pans or
             similar devices during refuelling and equipment maintenance;
      -      fitting all fixed and small plant (i.e. not including Heavy Mobile Equipment) holding >10L of hydrocarbons or
             chemical with an external containment of 110 % capacity of the total volume contained in the equipment (such
             equipment includes but not be limited to; generators, welders, stationary engines, light stands, pumps, refuelling
             trailers and service/fuel trucks) unless exception is permitted by Site management;
      -      discouraging ‘topping-off’ of fuel tanks;
      -      storing all small plant (e.g. welders, small generators) that hold <10L of hydrocarbons or chemical out of line of
             fire and on plastic lining or drip trays;
      -      removing stormwater present within bunding immediately after a rain event and disposing of as contaminated
             water;
      -      providing and maintaining appropriate suction/pump equipment to evacuate water from bunds and other
             containment areas;
      -      sealing and containing chemical and hydrocarbon storage vessels (e.g. drums and chemical cabinets) when
             being transported;
      -      maintaining the Site in a neat and tidy condition;
      -      fitting service truck(s), re-fuelling trailers and other vehicles used for the transportation of hydrocarbons and
             chemicals with spill kits and drip trays (drip trays will be used to capture all spills and drips whenever re-fuelling is
             being undertaken);
      -      making effective spill clean up material readily available at each work area and on all mobile service trucks or
             vehicles where hydrocarbons and chemicals are stored and/or used;
      -      segregating oily waste materials, including liquid hydrocarbons, from general wastes for disposal/recycling off-
             site by a licensed contractor;
      -      recording incidents and identifying the cause and controls to be implemented to improve the management
             system;
      -      keeping records on personnel training and disposal of waste for all hazardous materials used on-site; and
      -      controlling and cleaning up spills immediately, as per accidental spill containment and clean-up protocol (refer to
             Appendix D – Spill Protocol).

3.4.5        Monitoring
      Areas where storage and handling of hazardous materials occur should be regularly inspected and be carried out by
      the Site Manager following delivery and/or use of the chemicals.
      All employees will be responsible for the safe day-to-day handling, use and temporary storage of chemicals being
      used on-site.

3.4.6        Auditing and Review
      An audit of the MSDS of chemicals used on-site shall be undertaken by the Site Manager and conducted as required
      or at least once a year.
      The hydrocarbon and chemical management strategies for the Site will be reviewed by the Site Manager periodically.

3.4.7        Reporting and Responsibility
      The Site Manager shall report results of any audits or monitoring undertaken.
      In the case of an incident the following information shall be recorded as a minimum and be kept and reviewed during
      site decommissioning:
       - date and time of spill;
       - approximate location of the spill;
       - substance spilled;
       - quantity spilled;
       - actions taken to contain and control spill;
       - method of disposal; and
       - person responsible for managing and removing the spill.




December 2012 / file ref. 1271_610_001                                                                              GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.