Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 213, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                         Page 29
West Ridge Quarry
Site Based Management Plan


      Records shall be kept on existing inventory, storage location, personnel training and disposal of waste for all
      hazardous materials used on-site.
      The location, volumes and chemicals involved in major and serious spills will be reported to the administrating
      authority.
      The Site Manager shall be responsible for ensuring all employees and contractors are aware of the requirement of the
      Hydrocarbon and Chemical Management Strategies.
      The Site Manager shall be responsible for recording the training of all employees on the procedure for containing and
      cleaning up of chemical oil and fuel spills, and the handling of other dangerous goods that may be used on-site.

3.4.8        Identification of Incident or Failure to Comply
      Significant chemical spill or release to the environment.

3.4.9        Contingency Plan
      Spillage and contamination will be immediately contained and a program designed to remediate any contamination
      shall be implemented in accordance with the on-site Spill Protocol (Refer to Appendix D – Spill Protocol).
      Assess processes to identify any significant changes and if required, modify activities/processes.
      Repair of bunds, enclosures or collection trays when damaged.




December 2012 / file ref. 1271_610_001                                                                     GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.