Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 225, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                              Page 41
West Ridge Quarry
Site Based Management Plan


Fauna and Flora
      Any necessary vegetation and fauna protection measures shall be in place prior to the commencement of any stage of
      Site excavations and be maintained until the area is fully rehabilitated, and shall include:
      - Installation of markers, flagging or fencing around protected vegetation/vegetation to be retained zones or areas
           under rehabilitation; and
      - Implementation of stormwater, erosion and sediment controls before any excavation works commence for each
           stage of extraction and are maintained until the area is fully rehabilitated.

Vegetation Clearing
      Prior to the clearing of any vegetation, a Vegetation Clearing Plan shall be prepared in accordance with the following
      protocols:
      - land disturbance is to be minimised and clearing limited, as far as practical, to the extent necessary for each
           stage;
      - the sequence and direction of vegetation clearing will be designed to ensure fauna has sufficient opportunity to
           move from the clearing Site without human intervention;
      - vegetation clearing shall be carried out in stages using a sequential clearing technique; and
      - prior to clearing, the limits of the approved area to be cleared shall be clearly marked with markers, flagging or
           fencing prior to clearing.

Topsoil Management
      Topsoil is the material that supports and promotes plant growth, soil micro-organisms, organic matter and nutrients.
      Topsoil is defined as the organic-rich and friable layer beneath the natural ground surface. The physical properties of
      topsoil are also important for promoting and supporting plant growth.
      The following measures should be implemented for topsoil stripping:
      - topsoil should not be stripped when it is too wet or too dry;
      - topsoil when stripped, should be used directly for rehabilitation to the maximum practicable extent or stockpiled
          and preserved for no longer than 12 months;
      - topsoil stockpiles are not to exceed a height of 2 m, shaped (i.e. batters no greater than 1H:2V) and revegetated
          to protect the soil from erosion and weed infestation;
      - maintain stockpiles in a free draining condition and avoid long-term soil saturation;
      - “run on” water should be prevented from flowing across the area to be stripped; and
      - topsoil stripping should be limited to the minimum area necessary.
      The following measures should be implemented for topsoil spreading:
      - whenever possible, stripped topsoil should be directly placed on an area undergoing rehabilitation;
      - areas to be topsoiled should be re-shaped prior to placing topsoil;
      - equipment used to spread topsoil should be scheduled to avoid compaction;
      - before respreading the topsoil, loosen the subsoil to break up any compacted or surface sealing and to enable
          keying of the two soils;
      - on slopes less than 3:1 (H:V) loosen lightly compacted subsoil with a tined implement to a depth of 50 mm to
          100 mm, and heavily compacted subsoils to a minimum depth of 300 mm, ensuring all ripping operations occur
          along the contour;
      - topsoil to be removed from stockpiles in a manner that avoids vehicles travelling over the stockpiles;
      - topsoil to be re-spread in the reverse sequence to its removal so that the original upper soil layer is returned to
          the surface to re-establish the entrapped seed content of the soil;
      - ensure all exposed subsoils are covered;
      - topsoil be respread over selected batters, contours, bunds and disturbed areas to a minimum thickness of
          100 mm;
      - after spreading topsoil, ensure the surface is left in a roughened state to assist moisture infiltration and inhibit soil
          erosion;
      - prior to any planting, cultivate any compacted or crusted topsoil surfaces (to a depth of 100 mm, but no greater
          than the depth of the topsoil);
      - soil spreading is to be immediately followed by seeding or planting if applicable; and




December 2012 / file ref. 1271_610_001                                                                          GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.