Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 232, section 1. The text section number identifies this passage in the reader.
CSR Building Products Limited Page 48
West Ridge Quarry
Site Based Management Plan
- organisation name;
- exact address;
- point of entry;
- nature of spill; and
- then let EHP hang up first.
Immediate Emergency Response
Stop work.
Shut down equipment, plant, power and vehicles as required.
Assist anyone in need of help.
Consider evacuating the area.
Contact the Supervisor and/or Site Manager to report:
- the location and time of the spill/incident/threat;
- nature and extent of the spill/incident/threat;
- if spill/incident has been contained or not;
- if any persons, installations or property could be in immediate danger;
- quickest and safest way for emergency services to approach the spill/incident site; and
- any other information that will assist to quickly contain the spill/incident/threat or minimise further release of
contaminant and environmental damage.
The Site Manager to notify relevant Administering Authorities.
Subsequent Response
After taking the initial actions, subsequent response actions to assess the situation, organisation of the dangerous goods
clean-up/fire-fighting operations and co-ordination of the response with involved parties shall be undertaken. Actions that
may be taken include:
Response to Unauthorised Determine cause of discharge and contaminant type.
Releases of Contaminants to
Contact EHP.
Waters:
Attempt to contain release of contaminant/s to waters.
Contact additional personnel to assist with containment.
Engage consultant to undertake an environmental assessment to determine the
level and impact of environmental harm.
Recover any contaminants for treatment or disposal where practical.
Engage consultant for Site assessment, remediation and validation.
Response That May Be Taken Activate Fire Protection System and Emergency Shut-Down devices where
if Fire Incidents Have Been applicable.
Detected:
Notify neighbouring residents and others that may be affected.
Evacuate non-essential personnel from scene of incident.
Clear access to scene for emergency fire-fighting vehicles and assign a person to
direct fire-fighters to the scene and prevent entry by unauthorised persons.
Conduct a head count at the emergency assembly point to ensure no one is
missing.
Establish communications by use of portable radios, phones or other means of
communication to field personnel and emergency responders.
Assemble available fire-fighting materials/pollution control equipment and stand by
to advise and/or assist Fire and Rescue Service to prevent any fuel storage rupture
by cooling.
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.