Skip to the record
Accept no substitutions.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 233, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                                Page 49
West Ridge Quarry
Site Based Management Plan



                                           Make sure emergency exit routes are kept open/unobstructed at all times.
                                           Cover any dangerous goods spill with foam to prevent fumes from travelling to an
                                           ignition source.
                                           Maintain safe distance and monitor area to prevent anyone other than Emergency
                                           Personnel from entering emergency area.
                                           Disposal of any contaminated material shall be handled by Fire and Rescue Service
                                           personnel.
                                           Engage consultants for Site remediation and validation, if required.

Response That May Be Taken                 Contact the emergency services or regulatory authority if applicable.
In the Event of a Solid Spill:
                                           Contain the spilled material and isolate the area.
                                           Clean and reload material if possible.
                                           Dispose of remaining material as appropriate.
Response that may be taken in the event of a Cyclone/Storm and/or Flood
General:                                 Undertake a check and general clean-up of the Site.
                                         In open areas, remove and dispose of all litter and waste material and ensure drains
                                         and sumps are clean.
                                         Remove all portable material and equipment that might become airborne to a suitable
                                         building.
                                         Remove all portable material and equipment that may be inundated by flooding to
                                         high ground.
                                         All non-portable materials and equipment to be secured and protected, as necessary.

 Cyclone Watch (Distant                  Company operations continue as normal.
 Cyclone) – Cyclone centre
                                         The Site Manager to monitor the location and severity of cyclone and notify all staff of
 is more than 24 hours
                                         any relevant warnings.
 predicted travelling time
 from area:                              Check inspection of quarry area(s) and initiate further clean-up as required.

 Cyclone Warning (Close                  Closely monitor location and severity of cyclone.
 Cyclone) – Cyclone centre
                                         Ensure battery operated radio is available on the premises to monitor reports.
 is within 24 hours predicted
 travelling time from the                Check that all doors and windows in all buildings are securely closed.
 area:
                                         Fill any emergency generators with fuel.
                                         Monitor progress of Site clean-up.
                                         Relocate any moveable items indoors.

 Cyclone      Imminent     –             Monitor the situation and decide appropriate time to commence shut down of
 Cyclone centre is within 12             operations.
 hours travel of the area:
                                         Clean-up completed and final inspection undertaken.
                                         Ensure First Aid is accessible.
                                         Non-essential personnel at their own request may leave the Site after a time
                                         designated by the Site Manager.
                                         Before vacating offices, all loose papers are to be placed in filing cabinets or draws.
                                         Computer screens to be unplugged and placed on the floor facing an internal wall.
                                         Computer equipment to be covered with plastic to prevent water damage.


December 2012 / file ref. 1271_610_001                                                                            GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.