Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 268, section 1. The text section number identifies this passage in the reader.
Specific Outcomes Probable Solutions Compliance Comments
/ /NA
Lake Macdonald Drive is protected and enhanced. view of the proposed extraction areas on-site from the road is
obscured by the riparian vegetation associated with Six Mile
Creek which will remain unaffected.
Laneways
O4 NA There are no laneways identified on-site or in close proximity to
Uses do not diminish the ability of laneways to – No solution provided. the Site.
a) relieve traffic on streets;
b) provide convenient and safe rear access to premises; and
c) add to the heritage character of Cooroy;
AND
O5 NA West Ridge Mining Lease (ML No. 3742) is located on Lot 3 on
Access for new uses is only taken off a laneway where upgrading works are No solution provided. SP108094, which is accessed through Lot 2 on SP108094. Both
carried out to the laneway to enable the laneway to accommodate the Lots 2 and 3 are owned by CSR. Vehicle access for the proposed
anticipated levels of traffic. extraction works will be via the existing driveway on Lot 2 and
along an existing track which connects to the existing mining
footprint in Lot 3. The access road will not involve upgrades or
changes as a result of the proposed development.
6.10 Built form
Density
O6 The proposed development for extractive industry is no different
The density of development within the site area – No solution provided. to the historical mining activities over the land. The only difference
a) is compatible with surrounding development; and to the historical mining activities over the land in comparison to
b) does not exceed – this development application for extractive industry is that the
i. For the Semi-Attached Housing Zone – 1 dwelling unit per 400m² of extraction of clay material will be used for its physical properties
site area with a maximum population density of 100 persons per as fill (e.g. for rehabilitation purposes for the Neales Quarry and
hectare; White Pit Quarry to the south of the Site) as opposed to using the
ii. For the Attached Housing Zone – maximum population density of clay material for its ceramic properties (which is defined as a
100 persons per hectare; and ‘mineral’ under the Mineral Resources Act 1989).
iii. For the Business Centre Zone – maximum population density of
100 persons per hectare; and The proposed works also serve the dual purpose of enabling the
iv. For the Community Services Zone – maximum population density reshaping of the West Ridge Mining Lease footprint and the
of 320 persons per hectare exclusively for the purposes of formation of gently sloping ground levels reflective of surrounding
Residential Aged Care and 160 persons per hectare for any other areas. Current contours were used to determine which areas
form of Retirement & Special needs housing; and surrounding the mining footprint required reshaping to form a
c) has a low site impact to enhance the opportunity to maintain natural site gentle slope. The final ground level of the pit will vary subject to
characteristics such as native vegetation and natural landforms. the total amount of material extracted. Reshaping the land at the
West Ridge Mining Lease will enable overland flow to drain
across the Site in a more natural manner rather than pooling in
December 2012 file ref.1271_DA1_310_002 2 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.