Specific Outcomes Probable Solutions Compliance Comments
/ /NA
Flooding and drainage
O14 S14.1 No permanent buildings or permanent structures are included as
Buildings and other works are designed and sited to – For new buildings or structures or additions of more part of the proposed development.
a) provide flood free access to premises and flood free habitable areas; than 50m² gross floor area to an existing building or
b) allow only minor, short term and infrequent flooding of non-habitable structure, floor levels for habitable rooms are – Access to the Site is existing, will remain unchanged and provides
areas; a) for areas where minimum floor levels are flood free access to the premises.
c) ensure carparking areas can be adequately drained; available – not less than the specified level;
d) ensure drainage does not adversely impact upon other premises; and b) for areas where flood modelling is available – Appropriate measures will be incorporated into the development
e) ensure filing or excavation does not adversely impact upon other a minimum of 500mm above the modelled to control erosion, sediment transportation, sediment capture and
premises by – flood level; and pH.
i. causing ponding of water on the site or nearby land; c) for areas where flood modelling is not
ii. increasing flooding, which adversely affects the safety or use of any available, a minimum of 500mm above the In relation to Six Mile Creek, the creek will be protected by the
land upstream and downstream; and highest known flood level; following measures:
iii. adversely affecting the flow of water in any overland flow path.
AND at least 100 m of separation from the area of disturbance to
the mapped watercourse and associated mapped remnant
vegetation;
a 20 m setback from the eastern most boundary of the
mining lease; and
CSR’s requirement to comply with their Environmental
Approval (EA) conditions for their activities, specifically:
- diversion bunds above the extractive areas to divert
clean stormwater runoff around the disturbed area;
and
- establishing a system of stormwater controls for
stormwater runoff prior to release as currently required
under the EA, and likely to be imposed by the DEHP
through the conditions of ERA 16.
The Site Based Management Plan (ATTACHMENT 8) provides
the framework for environmental management on the Site and is
a practical guide at the operational level to contain environmental
impacts. The SBMP has been prepared to assist in the
management and protection of surrounding environment values
and describes how the operator proposes to manage potential
environmental impacts which may be caused by carrying out
extractive and processing activities.
S14.2 NOTED
Where Council infrastructure is available –
a) any drainage (including buildings and yards)
flows to that infrastructure; and
December 2012 file ref.1271_DA1_310_002 5 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.