Original PDF page 272, section 1. The text section number identifies this passage in the reader.
Specific Outcomes Probable Solutions Compliance Comments
/ /NA
b) the infrastructure has the capacity to accept
any additional loading;
AND
S14.3 NOTED All extraction activities on-site will be undertaken in a manner
Car parking and manoeuvring areas are consistent with the existing mining lease approvals over the land.
constructed at a level that permits the parking area Car parking will be provided at the Site on Lot 3 on SP108094.
to drain from the site by gravity means, without the
need for mechanical pumping; or In accordance with this provision, car parking and manoeuvring
areas will be constructed at a level that permits the parking area
to drain from the site by gravity means, without the need for
mechanical pumping.
S14.4 NA The development is not for residential purposes.
Basements for residential uses have flood immunity
above the Q100 where alternative means to
mechanical pumping are used to achieve such
immunity; or
S14.5 NA The proposed development does not involve basements as part
Basements for non-residential uses have flood of the development for extractive industry on-site.
immunity above the Q100 that may be achieved by
means of mechanical pumping where the
mechanical feature is installed with adequate
holding tanks and an alternative back up power
source.
Sloping sites
O15 S15.1 NA The proposed development does not involve permanent buildings
On sloping sites, buildings and structures are designed to maximise the use of Buildings are split level design that step down the as part of the extractive industry operations.
natural slope and minimise the need for cut and fill. slope or have a suspended floor construction; (See
Figure 6.1 below) No permanent structures will be included on-site as part of the
development.
AND
S15.2 NA The proposed development does not involve permanent buildings
Cut or fill is less than 2m in depth; as part of the extractive industry operations. Whilst the proposed
development is to extract material for clean fill on-site to be
AND utilised as fill in the rehabilitation of CSR mining leases to the
south (at Neales Quarry and White Pit Quarry), the proposed
works will also serve the dual purpose of enabling the reshaping
December 2012 file ref.1271_DA1_310_002 6 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.