Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 272, section 1. The text section number identifies this passage in the reader.

Specific Outcomes                                                                Probable Solutions                                     Compliance   Comments
                                                                                                                                           / /NA
                                                                                 b)    the infrastructure has the capacity to accept
                                                                                       any additional loading;

                                                                                 AND

                                                                                 S14.3                                                    NOTED      All extraction activities on-site will be undertaken in a manner
                                                                                 Car parking and manoeuvring areas are                               consistent with the existing mining lease approvals over the land.
                                                                                 constructed at a level that permits the parking area                Car parking will be provided at the Site on Lot 3 on SP108094.
                                                                                 to drain from the site by gravity means, without the
                                                                                 need for mechanical pumping; or                                     In accordance with this provision, car parking and manoeuvring
                                                                                                                                                     areas will be constructed at a level that permits the parking area
                                                                                                                                                     to drain from the site by gravity means, without the need for
                                                                                                                                                     mechanical pumping.

                                                                                 S14.4                                                     NA        The development is not for residential purposes.
                                                                                 Basements for residential uses have flood immunity
                                                                                 above the Q100 where alternative means to
                                                                                 mechanical pumping are used to achieve such
                                                                                 immunity; or

                                                                                 S14.5                                                     NA        The proposed development does not involve basements as part
                                                                                 Basements for non-residential uses have flood                       of the development for extractive industry on-site.
                                                                                 immunity above the Q100 that may be achieved by
                                                                                 means of mechanical pumping where the
                                                                                 mechanical feature is installed with adequate
                                                                                 holding tanks and an alternative back up power
                                                                                 source.

Sloping sites
O15                                                                              S15.1                                                     NA        The proposed development does not involve permanent buildings
On sloping sites, buildings and structures are designed to maximise the use of   Buildings are split level design that step down the                 as part of the extractive industry operations.
natural slope and minimise the need for cut and fill.                            slope or have a suspended floor construction; (See
                                                                                 Figure 6.1 below)                                                   No permanent structures will be included on-site as part of the
                                                                                                                                                     development.
                                                                                 AND

                                                                                 S15.2                                                     NA        The proposed development does not involve permanent buildings
                                                                                 Cut or fill is less than 2m in depth;                               as part of the extractive industry operations. Whilst the proposed
                                                                                                                                                     development is to extract material for clean fill on-site to be
                                                                                 AND                                                                 utilised as fill in the rehabilitation of CSR mining leases to the
                                                                                                                                                     south (at Neales Quarry and White Pit Quarry), the proposed
                                                                                                                                                     works will also serve the dual purpose of enabling the reshaping


  December 2012 file ref.1271_DA1_310_002                                                                                        6                                                                Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.