Specific Outcomes Probable Solutions Compliance Comments
/ /NA
O22 S22.1 NA Refer to response to O21 above.
The Noosa Trail Network in the locality is supported by overnight camping No solution provided.
facilities, home-hosted accommodation and signage, allowing local residents
and visitors to experience the natural values of the area and to access key
destinations including –
a) the town of Cooroy;
b) Lake Macdonald;
c) the Botanic Gardens; and
d) State forests, conservation parks and other recreation facilities in the
locality.
Pedestrian and bicycle pathways
O23 S23.1 Lake Macdonald Drive is identified as a ‘Pathway and Bikeway’
Safe and convenient pedestrian and bicycle pathways are provided and Pedestrian and bicycle pathways are provided and on Council’s Planning Scheme Map 2 – Pathways Trunk Network
retained between and around key destinations, including retained where indicated in Schedule 5 – Map 2. Infrastructure in Schedule 5.
a) between Cooroy and Tewantin;
b) between Cooroy and the Noosa Botanical Gardens; and The Site is appropriately screened from Lake Macdonald Drive.
c) within and around the town of Cooroy. The proposed works on-site are approximately 800 m from this
road and the view of the proposed extraction areas on-site from
this road is obscured by the riparian vegetation associated with
Six Mile Creek which will remain unaffected.
A Traffic Impact Assessment Report prepared by TTM Group has
been included as part of the assessment of the development
which investigates the proposed haulage route between the
subject Site and the two sites to the south (Neales Pit and White
Pit Quarry) to be rehabilitated (refer ATTACHMENT 7 – TRAFFIC
IMPACT ASSESSMENT REPORT).
The Traffic Impact Assessment Report anticipates that it is not
expected that any significant pavement damage will occur to Lake
Macdonald Drive during the haulage of activities. In addition, the
assessment provides that the haulage of materials along Lake
Macdonald Drive is anticipated to not impact existing public
transport, cyclist or pedestrian activity.
In addition, the increase in traffic along Lake Macdonald Drive
relating to transport of materials from the West Ridge Mining
Lease to the other sites (to the south of the Site) will be temporary
in nature (works to take 2 years to complete), and will occur only
over a short distance (i.e. 1.2 km).
December 2012 file ref.1271_DA1_310_002 12 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.