Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 283, section 1. The text section number identifies this passage in the reader.
Specific Outcomes Probable Solutions Compliance Comments
/ /NA
O82 S82.1 The proposed extraction is positioned in a manner which avoids:
The landscape character and visual amenity quality of hill slopes and ridgelines On properties with a slope exceeding 1 in 4
are retained. (25%) or located on ridgelines visible from the remnant and high value regrowth vegetation, watercourses
major road network the roofline of buildings do and ridgelines;
not protrude above the ridgeline or tree canopy. a Conservation Estate (an its buffer) associated with Yurol
State Forest, located on an adjoining property to Lot 3 and
at least 800 m from the proposed extraction areas on-site;
and
a recognised Open Space Corridor as shown in Schedule 5
– Map 4 Open Space Networks of the Noosa Shire Planning
Scheme.
The proposed works on-site are approximately 800 m from Lake
Macdonald Drive and the view of the proposed extraction areas
on-site from this road is obscured by the riparian vegetation
associated with Six Mile Creek which will remain unaffected. As
such, it is not likely that the development will have significant
impacts on the visual amenity of the Site and surrounds.
Incompatible uses
O83 NA The proposed development is not for dwelling units.
New dwelling units are to provide for sufficient buffer area between the premises No solution provided.
and existing Industrial business uses on other premises to avoid any potential
adverse amenity impacts on residents.
6.38 Open space, environment and conservation
Environmental values
O84 An Ecological Assessment Report (ATTACHMENT 6) has been
The environmental values of land are protected from adverse impacts as a No solution provided. prepared for the Site, which provides an analysis of the ecological
consequence of development in or adjacent to that land. values of the area and an assessment of the proposed
disturbance areas on the ecological values of the Site and
surrounds. It is anticipated that the proposed development will not
impact on the natural Site characteristics such as native
vegetation and natural landforms.
The Site Based Management Plan prepared for the Site
(ATTACHMENT 8) provides a framework for environmental
management and is a practical guide at the operational level to
contain environmental impacts.
December 2012 file ref.1271_DA1_310_002 17 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.