Skip to the record
Accept no substitutions.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 283, section 1. The text section number identifies this passage in the reader.

Specific Outcomes                                                                   Probable Solutions                                 Compliance   Comments
                                                                                                                                          / /NA
O82                                                                                 S82.1                                                           The proposed extraction is positioned in a manner which avoids:
The landscape character and visual amenity quality of hill slopes and ridgelines    On properties with a slope exceeding 1 in 4
are retained.                                                                       (25%) or located on ridgelines visible from the                      remnant and high value regrowth vegetation, watercourses
                                                                                    major road network the roofline of buildings do                      and ridgelines;
                                                                                    not protrude above the ridgeline or tree canopy.                     a Conservation Estate (an its buffer) associated with Yurol
                                                                                                                                                         State Forest, located on an adjoining property to Lot 3 and
                                                                                                                                                         at least 800 m from the proposed extraction areas on-site;
                                                                                                                                                         and
                                                                                                                                                         a recognised Open Space Corridor as shown in Schedule 5
                                                                                                                                                         – Map 4 Open Space Networks of the Noosa Shire Planning
                                                                                                                                                         Scheme.

                                                                                                                                                    The proposed works on-site are approximately 800 m from Lake
                                                                                                                                                    Macdonald Drive and the view of the proposed extraction areas
                                                                                                                                                    on-site from this road is obscured by the riparian vegetation
                                                                                                                                                    associated with Six Mile Creek which will remain unaffected. As
                                                                                                                                                    such, it is not likely that the development will have significant
                                                                                                                                                    impacts on the visual amenity of the Site and surrounds.

Incompatible uses
O83                                                                                                                                       NA        The proposed development is not for dwelling units.
New dwelling units are to provide for sufficient buffer area between the premises   No solution provided.
and existing Industrial business uses on other premises to avoid any potential
adverse amenity impacts on residents.

6.38 Open space, environment and conservation
Environmental values
O84                                                                                                                                                 An Ecological Assessment Report (ATTACHMENT 6) has been
The environmental values of land are protected from adverse impacts as a            No solution provided.                                           prepared for the Site, which provides an analysis of the ecological
consequence of development in or adjacent to that land.                                                                                             values of the area and an assessment of the proposed
                                                                                                                                                    disturbance areas on the ecological values of the Site and
                                                                                                                                                    surrounds. It is anticipated that the proposed development will not
                                                                                                                                                    impact on the natural Site characteristics such as native
                                                                                                                                                    vegetation and natural landforms.

                                                                                                                                                    The Site Based Management Plan prepared for the Site
                                                                                                                                                    (ATTACHMENT 8) provides a framework for environmental
                                                                                                                                                    management and is a practical guide at the operational level to
                                                                                                                                                    contain environmental impacts.




  December 2012 file ref.1271_DA1_310_002                                                                                      17                                                                Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.