Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 284, section 1. The text section number identifies this passage in the reader.

  Business Use Code

Specific Outcomes                                                              Probable Solutions                                   Compliance   Comments
                                                                                                                                       / /NA
Table 14 – 5 New Business Uses Within Existing Buildings in Established Centres – NOT APPLICABLE
Table 14 – 6 New Industrial Uses Within Existing Buildings Within Existing Industrial Estates – NOT APPLICABLE
Table 14 – 7 Estate Sales Offices – NOT APPLICABLE
Table 14 – 8 For all Business Uses
14.16 Effects of use
Electricity infrastructure
O18                                                                            S18.1                                                             The development is not likely to impact on existing or future
The development does not adversely impact on existing or future electricity    No solution provided.                                             electricity supply infrastructure.
supply infrastructure;
                                                                                                                                                 The proposed development will utilise existing local services
AND                                                                                                                                              provided on-site and will not require any further public utilities and
                                                                                                                                                 services for the operations of the development.

O19                                                                            S19.1                                                   NA        There is no electrical infrastructure (including substations,
All uses and works maintain an adequate safe distance from electrical          Development for uses adjacent to or within 50m                    overhead powerlines, power poles and transformers) identified as
infrastructure including substations, overhead powerlines, power poles and     of an existing electricity substation incorporates                being located in close proximity to the proposed disturbance
transformers.                                                                  noise attenuation measures to mitigate noise                      areas on-site.
                                                                               impacts;

                                                                               AND

                                                                               S19.2                                                   NA        The proposed development does not involve permanent buildings
                                                                               Buildings and structures (including swimming                      and permanent structures.
                                                                               pools, sheds, tennis courts and outbuildings) are
                                                                               not constructed under overhead electricity
                                                                               transmission lines, or within electricity
                                                                               easements.

Noise
O20                                                                                                                                              The proposed hours of operation are 6:00am to 6:00pm Monday
Development is designed and sited to avoid noise emissions that unreasonably   No solution provided.                                             to Friday and 7:00am to 3:00pm Saturday. No operations will be
diminish the amenity of the area or surrounding uses.                                                                                            conducted on Sundays, Anzac Day, Christmas Day, Easter
                                                                                                                                                 Monday or Good Friday. It is anticipated that surrounding land
                                                                                                                                                 uses will not be impacted upon by noise emissions during the
                                                                                                                                                 hours of operation for the proposed activities.

                                                                                                                                                 Extractive industry operations on-site will be guided by a Site
                                                                                                                                                 Based Management Plan (ATTACHMENT 8), which provides a
                                                                                                                                                 framework for environmental management on Site and is a



  December 2012 file ref.1271_DA1_310_002                                                                                  18                                                                   Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗