Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 284, section 1. The text section number identifies this passage in the reader.
Business Use Code
Specific Outcomes Probable Solutions Compliance Comments
/ /NA
Table 14 – 5 New Business Uses Within Existing Buildings in Established Centres – NOT APPLICABLE
Table 14 – 6 New Industrial Uses Within Existing Buildings Within Existing Industrial Estates – NOT APPLICABLE
Table 14 – 7 Estate Sales Offices – NOT APPLICABLE
Table 14 – 8 For all Business Uses
14.16 Effects of use
Electricity infrastructure
O18 S18.1 The development is not likely to impact on existing or future
The development does not adversely impact on existing or future electricity No solution provided. electricity supply infrastructure.
supply infrastructure;
The proposed development will utilise existing local services
AND provided on-site and will not require any further public utilities and
services for the operations of the development.
O19 S19.1 NA There is no electrical infrastructure (including substations,
All uses and works maintain an adequate safe distance from electrical Development for uses adjacent to or within 50m overhead powerlines, power poles and transformers) identified as
infrastructure including substations, overhead powerlines, power poles and of an existing electricity substation incorporates being located in close proximity to the proposed disturbance
transformers. noise attenuation measures to mitigate noise areas on-site.
impacts;
AND
S19.2 NA The proposed development does not involve permanent buildings
Buildings and structures (including swimming and permanent structures.
pools, sheds, tennis courts and outbuildings) are
not constructed under overhead electricity
transmission lines, or within electricity
easements.
Noise
O20 The proposed hours of operation are 6:00am to 6:00pm Monday
Development is designed and sited to avoid noise emissions that unreasonably No solution provided. to Friday and 7:00am to 3:00pm Saturday. No operations will be
diminish the amenity of the area or surrounding uses. conducted on Sundays, Anzac Day, Christmas Day, Easter
Monday or Good Friday. It is anticipated that surrounding land
uses will not be impacted upon by noise emissions during the
hours of operation for the proposed activities.
Extractive industry operations on-site will be guided by a Site
Based Management Plan (ATTACHMENT 8), which provides a
framework for environmental management on Site and is a
December 2012 file ref.1271_DA1_310_002 18 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.