Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 286, section 1. The text section number identifies this passage in the reader.
Specific Outcomes Probable Solutions Compliance Comments
/ /NA
Safety and security
O22 S22.1 All extraction activities included as part of the proposed
All property boundaries are clearly identifiable with public and private spaces Boundaries are identified by such means as - development will be undertaken in a manner consistent with the
clearly defined. a) fencing; or existing mining lease approvals over the land.
b) changes in surface materials or levels; or
c) landscape treatments; The Site provides existing clearly identifiable boundaries.
AND
S22.2 Outside working hours, vehicular access will be secured with the
Loading and storage areas are well lit or can be use of a lockable gate. Unauthorised vehicle access will also be
locked after hours. prevented through fencing installation.
O23 S23.1 The proposed development is located on Lot 3 on SP108094,
All premises and access routes are clearly identifiable to all persons, particularly All premises are identified by the provision of the which is accessed through Lot 2 on SP108094. Both Lots 2 and 3
emergency services personnel. street number in a prominent location, preferably are owned by CSR. Vehicle access for the proposed extraction
near the site entry, (i.e. on the kerb or letterbox works will be via the existing driveway on Lot 2 and along an
or by signage on the building or site). existing track which connects to the existing mining footprint in
Lot 3. The access road will not involve upgrades or changes as a
result of the proposed development.
Appropriate car parking spaces will be provided at the Site on Lot
3 on SP108094.
The premises provides identifiable signage near the entry of Lot 2
on SP108094.
O24 S24.1 Refer to response to O23 above.
All building entries are designed to be obvious and easily identifiable. The number of entrances and exits are limited
and main building entrances/exits are located at
the front of the site, in view of the street. Where
this is not possible, due to site or existing
building constraints, a well defined path is
provided to the entrance/exit;
AND
S24.2 N/A The proposed development is not accessible by members of the
All entrances/exits to buildings, are well lit and public. The lighting and signage of the Site will reflect the nature
signed, and signage includes hours of operation; of the use, including the requirement to exclude members of the
public for workplace health and safety requirements.
AND
December 2012 file ref.1271_DA1_310_002 20 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.