Specific Outcomes Probable Solutions Compliance Comments
/ /NA
practical guide at the operational level to contain environmental
impacts including noise. Noise control measures will be employed
to maintain environmental values and standards in accordance
with relevant regulations, policies and conditions.
All extraction activities included as part of the proposed
development will be undertaken in a manner consistent with the
existing mining lease approvals over the land.
In addition, the approval sought is for a limited purpose (to enable
rehabilitation of the sites to the south at Neales Quarry and White
Pit Quarry). It is anticipated that the volume of material required
can be obtained and hauled within a period of 2 years from
commencement of operations.
Mechanical plant and equipment and storage areas
O21 S21.1 N/A The proposed development does not involve permanent buildings
Mechanical plant and equipment (including air conditioning equipment) and Mechanical plant and equipment are— and permanent structures.
storage areas are designed and located to— a) located more than 2m from any property
a) avoid adverse visual impacts when viewed from the street and adjoining boundary;
properties; and b) where located at ground level, screened by
b) visually integrate with the building design. fencing 1.5m in height or dense vegetation
of at least 1.5m in width incorporating
grouped trees and shrubs with maximum
separation distance of 1m measured from
the centre of the tree or scrub; and
c) are visually integrated into the line and
plane of the building and roof design and
do not project beyond the height or width of
the building when viewed from the street
and adjoining properties;
AND
S21.2 NOTED In accordance with this condition, stockpiling areas and topsoil/
For Industrial business and Retail business overburden storage areas on-site as a result of the proposed
Type 3, materials stored outside of a building do works will not exceed 4 m in height.
not exceed 4m in height or half the height of the
on-site buildings whichever is the greater.
December 2012 file ref.1271_DA1_310_002 19 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.