Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 285, section 1. The text section number identifies this passage in the reader.

Specific Outcomes                                                           Probable Solutions                                  Compliance   Comments
                                                                                                                                   / /NA
                                                                                                                                             practical guide at the operational level to contain environmental
                                                                                                                                             impacts including noise. Noise control measures will be employed
                                                                                                                                             to maintain environmental values and standards in accordance
                                                                                                                                             with relevant regulations, policies and conditions.

                                                                                                                                             All extraction activities included as part of the proposed
                                                                                                                                             development will be undertaken in a manner consistent with the
                                                                                                                                             existing mining lease approvals over the land.

                                                                                                                                             In addition, the approval sought is for a limited purpose (to enable
                                                                                                                                             rehabilitation of the sites to the south at Neales Quarry and White
                                                                                                                                             Pit Quarry). It is anticipated that the volume of material required
                                                                                                                                             can be obtained and hauled within a period of 2 years from
                                                                                                                                             commencement of operations.

Mechanical plant and equipment and storage areas
O21                                                                         S21.1                                                  N/A       The proposed development does not involve permanent buildings
Mechanical plant and equipment (including air conditioning equipment) and   Mechanical plant and equipment are—                              and permanent structures.
storage areas are designed and located to—                                  a) located more than 2m from any property
a) avoid adverse visual impacts when viewed from the street and adjoining        boundary;
     properties; and                                                        b) where located at ground level, screened by
b) visually integrate with the building design.                                  fencing 1.5m in height or dense vegetation
                                                                                 of at least 1.5m in width incorporating
                                                                                 grouped trees and shrubs with maximum
                                                                                 separation distance of 1m measured from
                                                                                 the centre of the tree or scrub; and
                                                                            c) are visually integrated into the line and
                                                                                 plane of the building and roof design and
                                                                                 do not project beyond the height or width of
                                                                                 the building when viewed from the street
                                                                                 and adjoining properties;

                                                                            AND

                                                                            S21.2                                                 NOTED      In accordance with this condition, stockpiling areas and topsoil/
                                                                            For Industrial business and Retail business                      overburden storage areas on-site as a result of the proposed
                                                                            Type 3, materials stored outside of a building do                works will not exceed 4 m in height.
                                                                            not exceed 4m in height or half the height of the
                                                                            on-site buildings whichever is the greater.




  December 2012 file ref.1271_DA1_310_002                                                                              19                                                                 Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.