Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 325, section 1. The text section number identifies this passage in the reader.

Planning Assessment Report                                                                                                   Page 2
300 Kennedys Road, Lake Macdonald QLD 4563 – Extractive Industry




2.           DESCRIPTION OF THE DEVELOPMENT PROPOSAL
2.1          Description of the Development Proposal
The proposed development relates to a Material Change of Use for Extractive Industry and associated Environmentally
Relevant Activities (ERAs) on land situated at 300 Kennedys Road, Lake Macdonald QLD 4563 and described as Lot 3 on
SP108094 and Lot 2 on SP108094 (refer FIGURE 1 – SITE LOCATION PLAN and FIGURE 2 – SITE AND
SURROUNDS).

As the material from the Site will be extracted to be used as clean fill, and not for its mineral qualities, the activity cannot be
conducted under CSR’s Plan of Operations (PoO) (refer ATTACHMENT 1 – PLAN OF OPERATIONS: 2012 – 2017) and
Environmental Authority (EA) for the current mining lease (ML No. 3742) on the Site. As such, the proposed activity
constitutes a Material Change of Use in accordance with the Sustainable Planning Act 2009.

The Applicant is seeking a:

      Development Permit for a Material Change of Use for Extractive Industry (Industrial Business Type 3 – Extractive);
      and
      Development Permit for a Material Change of Use for Environmentally Relevant Activities (ERAs) 16 – Extractive and
      Screening Activities:
      - ERA 16 (2)(c): Extracting, other than by dredging, in a year, the following quantity of material – more than
          100,000 t to 1,000,000 t; and
      - ERA 16 (3)(b): Screening, in a year, the following quantity of material – 100,000 t to 1,000,000 t.

The development proposal is for the establishment of extractive industry activities and associated Environmentally
Relevant Activities on the Site. The proposed development involves the extraction of clay at the existing West Ridge Mining
Lease (ML No. 3742) on Lot 3 on SP108094 for the purpose of providing material to be used for clean fill. The material
extracted from the Site will be utilised as clean fill in the rehabilitation of the CSR mining leases to the south of the Site in
order to establish an appropriate landform to facilitate post extraction land uses. It is anticipated that approximately 900,000 t
of material will be required to be extracted from the Site in order to complete the rehabilitation works.

The CSR owned mining leases to the south of the Site, to be rehabilitated with the clay fill material, are described as:

      Neales Quarry: 125 Lake Macdonald Drive, Lake Macdonald QLD (described as Lot 8 on RP160703 and Lot 2 on
      RP852009) ; and
      White Pit Quarry: 93 Lake Macdonald Drive, Lake Macdonald QLD (described as Lot 101 on SP142407, Lot 140 on
      MCH978, and Lot 3 on RP137375).

FIGURE 3 – CONCEPTUAL SITE LAYOUT PLAN of this Planning Report shows a conceptual layout of the Site and final
ground levels as a result of the proposed development.

The impacts on the environment will be limited as all activities will be within portions of the Site which have been previously
disturbed. The proposed disturbance areas are contained within an existing mining lease (ML No. 3742), and will expand
upon the already disturbed mining footprint to enable landform reshaping. As a result, the proposed disturbance areas
avoid several ecological values recognised by State regulations.

Site operations will comprise the following standard quarrying methods, comprising the following basic elements:

      vegetation clearing;
      topsoil and overburden stripping;
      stripping of clay material progressively using mechanical equipment (i.e. hydraulic excavator, loader or bulldozer with
      ripper attachment, or similar earthmoving equipment) and stockpiling on-site for the rehabilitation works (at Neales
      Quarry and White Pit Quarry), where required;
      screening the raw material using a mobile processing plant; and



December 2012 / file ref. 1271_DA1_310_001                                                                       GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.