Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

Table 8 - Red Pit Quarry
                                                       A. The largest total area of            B. Work required to achieve the rehabilitation        C. Cost ($/ha) (third party cost to   D. Cost to rehabilitate the
Type of Disturbance                          Tick      disturbance that will occur             objectives (e.g. pit backfilling, re-contouring,      rehabilitate area of disturbance—          maximum area of
                                                    during the period of the plan (ha)              fertilising, seeding, other (specify))                as per attached quote)           disturbance (i.e. A x C) ($)
Hand mining                                                                              N/A
Drilling/wells                                                                           N/A
Raw ore storage yard                                                                     N/A
Cleared vegetation                                                                       N/A
Alluvial mining                                                                          N/A
Voids, pits, trenches < than 3m deep                                                     N/A
                                                                                         Reprofiling and recontouring, seeding (grass seed) and
Voids, pits, trenches > than 3m deep                             0.70 ha                                                                                        $10,496.00                         $7,347.20
                                                                                         fertilising
Underground / shafts                                                                     N/A
Tail dam                                                                                 N/A
Reject stockpiles                                                                        N/A
                                                                                         Minor final perimeter trim earthworks including battering
Water storage dam                                                0.30 ha                 slopes (max 20 degree), ripping, seeding (grass seed)                  $10,496.00                         $3,148.80
                                                                                         and fertilising
Waste rock dumps                                                                         N/A
Topsoil stockpiles                                                                       N/A                                                                     $5,596.00
Processing plant                                                                         N/A
Access tracks                                                    0.21 ha                 To maintain as beneficial use by landowner agreement                        $0                                $0
Camp / offices / sheds                                                                   N/A
Workshops / fuel / chemical storage                                                      N/A
                                                                                         Costs based on transport to all sites. Therefore divided
Mobilisation Costs                                                 N/A                                                                                           $1,166.66                         $1,166.66
                                                                                         by 6 to give price per site.
Total Area: 1.21 ha                                                                                                                         E. Total rehabilitation cost                           $11,662.66
                                                                                                     F. Maintenance and monitoring costs (10% of rehabilitation cost)                              $1,166.27
                                                                                            G. CPI (3% of total rehabilitation cost x number of years covered by plan)                              $349.88
     The period of the plan is for 5 years                                                                                              H. GST (10%): 0.1 x (E + F + G)    $1,317.88
                                                                                                                                                                          $14,496.69
                                                                                                                                                                 ($10,900 after Performance
                                                                                                                                                                Category 4 and EMS discount
                                                                      Financial assurance required (incl. GST, CPI and maintenance/monitoring): (E + F + G + H)     applied as per code of
                                                                                                                                                                compliance, value rounded to
                                                                                                                                                                        nearest $100)
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.