Table 9 - West Ridge Quarry
A. The largest total area of B. Work required to achieve the rehabilitation C. Cost ($/ha) (third party cost to D. Cost to rehabilitate the
Type of Disturbance Tick disturbance that will occur objectives (e.g. pit backfilling, re-contouring, rehabilitate area of disturbance— maximum area of
during the period of the plan (ha) fertilising, seeding, other (specify)) as per attached quote) disturbance (i.e. A x C) ($)
Hand mining N/A
Drilling/wells N/A
Raw ore storage yard N/A
Cleared vegetation N/A
Alluvial mining N/A
Voids, pits, trenches < than 3m deep N/A
Reprofiling and recontouring, respreading available
Voids, pits, trenches > than 3m deep 6.53 ha $21,296.00 $139,062.88
topsoil, seeding (grass seed) and fertilising
Underground / shafts N/A
Tail dam N/A
Reject stockpiles N/A
Minor final perimeter trim earthworks including battering
Water storage dam 0.56 ha slopes (max 20 degree), ripping, seeding (grass seed) $10,496.00 $5,877.76
and fertilising
Waste rock dumps N/A
Respread topsoil over backfilled areas, minor levelling
Topsoil stockpiles 0.17 ha works on topsoil storage footprint, ripping, seeding $5,596.00 $951.32
(grass seed) and fertilising
Processing plant N/A
Access tracks 0.70 ha To maintain as beneficial use by landowner agreement $0 $0
Camp / offices / sheds N/A
Workshops / fuel / chemical storage N/A
Minor levelling works on storage footprint, ripping,
Materials Stockpile 0.71 ha $5,596.00 $3,973.16
seeding (grass seed) and fertilising
Costs based on transport to all sites. Therefore divided
Mobilisation Costs N/A $1,166.66 $1,166.66
by 6 to give price per site.
Total Area: 8.67 ha E. Total rehabilitation cost $151,031.78
F. Maintenance and monitoring costs (10% of rehabilitation cost) $15,103.18
G. CPI (3% of total rehabilitation cost x number of years covered by plan) $4,530.95
The period of the plan is for 5 years H. GST (10%): 0.1 x (E + F + G) $17,066.59
$187,732.50
($140,800 after Performance
Financial assurance required (incl. GST, CPI and maintenance/monitoring): (E + F + G + H) Category 4 and EMS discount
applied as per code of compliance,
value rounded to nearest $100)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.