Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 93, section 1. The text section number identifies this passage in the reader.
CSR West Ridge Quarry Ecological Assessment Report 4.5 Design Responses to Ecological Values The two proposed disturbance areas are located within portions of the site which have been previously disturbed. A large portion of the proposed disturbance areas currently supports open cleared paddocks and will not result in new isolated areas of disturbance. The proposed disturbance areas are contained within an existing mining lease, and will expand upon the already disturbed quarry pit to enable landform reshaping. As a result the proposed disturbance areas avoid several ecological values recognised by state regulations including: > areas of remnant vegetation pursuant to the VM Act; > areas of High Value Regrowth vegetation pursuant to the Regrowth Vegetation Code; > watercourses recognised by DERM under the VM Act and Regrowth Vegetation Code; > Koala Assessable Development Areas pursuant to the Koala SPRP mapping; > Referable Wetland areas pursuant to the SP Reg (however the proposed disturbance areas are located within the 100m buffer to such areas); and > Conservation Estate buffers recognised by the SP Reg. The proposed disturbance areas also predominantly avoid mapped areas recognised by The Noosa Plan including Environmental Enhancement Areas, Koala Habitat Areas, Major Waterbodies or watercourses/drainage lines and areas of flood and landslide hazard. The proposed disturbance areas are limited to the extent necessary for the topsoil and rehabilitation requirements of White Pit Quarry and Neales Quarry. Further, cleared areas and access tracks associated with the existing pit at West Ridge will be used for stockpiling, loading, machinery access, etc so as to minimise the total disturbance footprint. The proposed works are also consistent with the approved use of the area under the Mining Lease and does not involve activities that wouldn’t otherwise occur during standard mining operations within the Lease area. The works will need to be undertaken in a manner that protects downstream environments, namely Six Mile Creek, which could potentially support threatened frog species and provides connectivity values in the greater landscape. CSR Building Products Ltd Version 3 4 December 2012 Ecological Assessment Report V3.docx Commercial in Confidence Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.