Appendix J - Water Supply and Wastewater Servicing Report
Lutheran Services Page 4 of 15
PF80 - Cooroy Care Farm
24 May 2018 Ref. No. 2017.0616
▪ Lutheran Services will be required to complete a sewerage network analysis by a suitably
qualified and experienced consultant, outlining the impacts on the existing network and
identifying any upgrading works required to accommodate the connection;
▪ All proposed sewerage works must be designed and constructed in accordance with the South
East Queensland Water Supply and Sewerage Design and Construction Code, Unitywater’s
Connections Administration Manual and any other matter Unitywater considers to be relevant;
▪ Any change to Unitywater’s existing infrastructure as required by this proposal must be carried
out at no cost to Unitywater;
▪ Lutheran Services will be required to enter into an Infrastructure Agreement with Unitywater
for the connection;
▪ The connection will attract the following costs:
– Infrastructure Agreement cost;
– Infrastructure charges;
– Live connection (quoted works) charges;
– Service connection and wastewater discharge charges.
Water Main
Sewer Rising Main
Figure 4 Unitywater Services
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.