Appendix J - Water Supply and Wastewater Servicing Report
Lutheran Services Page 14 of 15
PF80 - Cooroy Care Farm
24 May 2018 Ref. No. 2017.0616
5 WASTEWATER MANAGEMENT
5.1 Proposed Wastewater System
The site wastewater systems will include:
▪ Gravity collection to a central private sewage pumping station;
▪ A direct pumped connection into the existing Unitywater rising main in Rose Gum Road.
5.2 Wastewater Flows
Based on the population data in Table 2 the estimated residential wastewater flows are provided
in Table 11.
Table 11 Estimated Wastewater Flows
Item Assumption Value
Design EP 87.5
Average Dry Weather Flow (ADWF) (kL/day) 200 L/EP 17.4
Annual Flow (ML/yr) 6.3
Peak Dry Weather Flow (kL/day) 2 x AD 34.7
Peak Wet Weather Flow (PWWF) (L/s) 4 x AD 1.00
5.3 Regulatory Requirements
All internal wastewater collection and pumping system will require Council plumbing approval.
The connection to the Unitywater rising main will be provided in accordance with Unitywater’s
requirements.
5.4 Connection to Unitywater Rising Main
Connection to the Unitywater rising main will be completed in accordance with Unitywater
requirements taking into account:
▪ Operating pressures within the rising main;
▪ Any pumping constraints imposed by Unitywater;
▪ Any specific connection requirements, such as connection type, valving arrangements and
backflow prevention requirements.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.