57. Lighting associated with the use must be designed, sited, installed and tested to comply with
Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive effects of
outdoor lighting” using a control level of 1.
58. Certification must be submitted to Council from a qualified person which certifies that all
outdoor lighting devices comply with the requirements of this Decision Notice at the time of
commissioning.
59. For the purpose of certifying outdoor lighting devices for the development, a qualified person
is:
a. a Registered Professional Engineer of Queensland;
b. an environmental or electrical design consultant with a minimum of 3 years current
experience in the field of outdoor lighting.
DEMOLITION
Approved Plans
60. Demolition must be undertaken in accordance with this approval and comply with the
approved plans of development.
Performance Bond
61. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council prior to the commencement of demolition works. The cash bond or
trading bank guarantee will be returned on performance of the demolition conditions of this
approval less any costs incurred by Council in respect of enforcing performance of these
demolition conditions. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Works
62. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste management
63. A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy 11 - Waste Management Plan and approved by Council’s Waste Coordinator
prior to the commencement of demolition works.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Segregated wastes attract significantly
reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable and
waste materials. These must be located so that they are convenient and safe to use.
The Plan must contain the following information:
a. Traffic Management Plan prepared by suitably qualified person for the demolition works
period. All required traffic control signage must be in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD);
b. All required erosion and sediment control measures to be employed or undertaken
during the demolition works to ensure sediment and other material from the demolition
does not leave the site;
c. The erosion and sediment control measures must be designed, installed and maintained
in accordance with current best practice standards until all disturbed surfaces are
stabilised;
Page 9 of 16
Document Set ID: 24873125
Version: 4, Version Date: 18/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - MCU19 0049 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 211 KB (small file)
- File type
No other editions are linked here.