Perky Turkey - Change Application - App B Approved Plans DN
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume(m³) *specify proposed *specify contractor contractor and
re-use or on-site and recycling outlet landfill site or
recycling methods other disposal
site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is
to be completed by the demolition contractor.
Building Appearance
14. All mechanical equipment and other service infrastructure located on the site must be:
a. located not less than 2 metres from a property boundary
b. fully enclosed or screened such that they are not visible from the street frontages nor
adjoining properties. Where screened by landscaping, landscaping beds must be at
least 1.5 metres wide.
No part of the site may be used for outdoor storage of materials unless specified on the
Approved Plans or the conditions of this Decision Notice.
LANDSCAPING
15. Dense landscaping must be provided to the southern boundary for a minimum width of 1.3
metres and include:
a. Syzygium australe, Syzygium leuhmanni or Syzygium hemilampra in minimum pot
sizes of 300mm planted at maximum spacing between stems of 1m.
b. Pruning must be limited to lateral (side) branches until the plants have reached a height
greater than 3 metres.
c. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of
foreign matter including anthropogenic waste, rock, soil/sediment contamination and is
applied to all planting areas to ensure a minimum 100mm depth once settled.
d. Soil for landscaping must provide for healthy and sustained site specific vegetation
performance.
16. All landscape works must be established and maintained in accordance with the approved
plans and conditions of approval for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to
full form and be refurbished when its life expectancy is reached.
Page 4 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.