        8.2. The detailed topography of the rear of the site showing both sides of the
             existing gully.

        8.3. Survey of the frontage of the site in order to ascertain the differential levels
             between the kerb line of Eumundi Noosa Road and the topography of site
             and the existing batter within the property.

        8.4. The actual locations of the existing public services within and outside the
             property including the existing storwater inlets and culvert in Gateway
             Drive, and any existing stormwater service discharging from the adjoining
             properties eg stormwater pipe discharging from the rear into the existing
             gully.

        8.5. The location of the existing sewer main on the site.

9.      Revised plans of the development to dedicate:-

        9.1. A road reserve along Eumundi Noosa Road to achieve a minimum 8m wide
             footpath verge between the existing kerb line and boundary line of the site.
             This is to be adjusted to accommodate the new kerb line for the modified
             roundabout.

        9.2. Where required, a road reserve along Gateway Drive to achieve a minimum
             6m wide footpath verges between the existing kerb line and boundary line
             of the site.

        9.3. Additional to the road reserve widening an appropriate truncation on the
             corner of Gateway Drive and Eumundi Noosa Road is required.

10.     Plans and cross sections showing the depth of the proposed earthworks (filling
        and cuts) on the site including batters and any retaining walls.

11.     Cross section/s to show the design levels, batters, accesses and services in
        relation to Eumundi Noosa Road and Gateway Drive.

12.     Detailed cross section/s of any proposed filling and retaining works along the
        gully near the northern boundary of the proposed development.

13.     Provide stormwater drainage layout plan/s for the site, and demonstrate that the
        proposed development will not caused additional stormwater ponding or have
        adverse impact on the drainage conditions on the adjoining properties i.e. how is
        discharge from the upstream properties dealt with.

14.     Provide Figure 4 from the Water Quantity Section of the Cardno Surface Water
        Management Plan.

15.     A1 (to scale) plan showing the carparking layout including dimensions of the
        spaces and aisles.

16.     Details of the loading bay/receiving area showing trucks’ maneuvering and
        specifying the types and sizes of delivery trucks using the site and demonstrating
        compliance with Australian Standards.




     Award Winner - Australian Clean Beach
       Challenge 2004 Litter Prevention

Used in these records

About this file

File size
19 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E253.001.pdf · 19 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.