17. Provide longitudinal sections for all the proposed accesses, ramps and trucks
delivery accesses to demonstrate compliance with Australian Standards.
18. Traffic Related Issues - Please provide response to the following issues raised in
relation to traffic and transportation matters and regarding the traffic impact
assessment report submitted by TTM dated February 2007.
18.1. Subject Site - It is not immediately clear if the development proposed
covers the whole of the three allotments described as the subject site, or
only part of them. The traffic report deals only with the impacts of traffic
generated by the Bunnings Warehouse component of the total site. If the
only development which is the subject of the application is the Bunnings
Warehouse, this should be clarified, although the traffic impact assessment
report should, in any event, also demonstrate the long term feasibility of the
traffic access arrangements proposed for the whole development site
shown on the John R. Brogan "Proposed Siting Plan" 1096-011A.
18.2. Traffic Volumes without Subject Development - Table 2 in the TTM report
estimates future (2016) traffic volumes based on forecasts in the
CATT2016 report, particularly dealing with the impacts of road network
changes principally including the Construction of Walter Hay Drive and
Eenie Creek Road Stage 2. Whatever impact these road network additions
are going to have will have occurred before the TTM traffic counts of
November 2006. It is noted that Walter Hay Drive opened in May 2006,
Eenie Creek Road Stage 2 opened in April 2006, the duplication of Eenie
Creek Road Stage 1 occurred in October 2006, and Eenie Creek Road
Stage 3 is currently scheduled to open in August 2008. However, Stage 3
is expected to have only minor impact on Eumundi Road traffic volumes.
Consequently, the applicant should independently estimate 2017 traffic
volumes based on their own growth estimates from the 2006 traffic counts,
and use those projections for analyses of 2017 operations.
18.3. Parking Provision Rate - The parking provision rate per square metre
proposed for the Bunnings development is significantly higher than has
previously been agreed to be appropriate for a use of this type. This higher
provision rate should be explained and/or justified. Further, if parking
provision rates are to be higher than normal, will design traffic generation
rates be similarly increased?
18.4. Roundabout at Eumundi Road and Rene Street - At Section 11 of the TTM
report, it is advised that the Rene Street roundabout should be upgraded to
provide two circulating lanes with a central island diameter of not less than
23 metres. A design for the upgraded roundabout has been previously
agreed. However, the proposal plans (for example, the John R. Brogan
plan 1096-030A) do not show either dedication for, or construction of, the
upgraded roundabout. The upgrading proposed needs to be clarified /
confirmed.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E253.001.pdfRelated documentPublic source context ↗
Request for Further Information - 010.2007.00000256.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19 KB (small file)
- File type
No other editions are linked here.