RFI - proposal plans 6 may 22 · MCU21/0212
Plans and drawings: the text below has words only, no drawings.
Very large file (30.2 MB): may take a few minutes to open.
A B C
site boundary
coastal setback
2.0m setback
site boundary
roof
RL39.790
rnd01
2400
rnd01
roof terrace ngl +8m at line of building
RL37.870 skl01
level 01
RL37.390
fen01 ngl +8m
3250
rnd01 gls01 scr01 scr01 scr01
stn01
ground level
RL34.140
rnd01 stn01
3240
lower ground fen01
RL30.900
ngl
1 elevation south
- 1 : 100
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
DL
DL
B
C
20.10.21
01.11.21
Prelim DA
DA submission
66 Seaview Tce, G & C Deane building elevations SD 300.03 E SCALE 1 : 100
elevation south
LM D 29.03.22 Revised DA
Sunshine Beach
LM E 1.04.22 Revised DA schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - proposal plans 6 may 22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 30.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.