Council archive · source document
RFI - proposal plans 6 may 22 · MCU21/0212
Plans and drawings: the text below has words only, no drawings.
Very large file (30.2 MB): may take a few minutes to open.
A B C
site boundary
coastal setback
2.0m setback
site boundary
roof
RL39.790
rnd01
2400
rnd01
roof terrace ngl +8m at line of building
R L37.870 skl01
level 01
RL37.390
fen01 ngl +8m
3250
rnd01 gls01 scr01 scr01 scr01
ground level
RL34.140
rnd01
3240
lower ground
RL30.900
ngl
1 elevation south
1 : 100
DRAWN REV DATE ISSUE PROJECT CLIEN T DR AW ING N AM E PHASE DW G NO R EV PRO JECT NO 0375
LM A 6.05.22 DA RFI
66 Seaview Tce, G & C Deane building elevation SD 305.03 A SC ALE 1 : 100
elevatio n south
Sunshine Beach schem atic design
1:1 @ A3
D o not scale from draw ings. D imensions are to be checked on site prior to com m encem ent of w ork. Discrepancies to be brought to the attention of the author. A ny dim ensions not nominated m ust be referred to the A rchitect for confirma tion. The concepts and inform ation contained in this docum ent are the copyright of Architect. U se or copying of the docum ent in w hole or in part w ithout the w ritten permission of the A rchitect constitutes an infringem ent of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - proposal plans 6 may 22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 30.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.