1. Ltr_160923_BA4090_Response to Information Request

Attached to the e-mail Response to Information Request - MCU16/0084 & OPW16/0157.

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

        Item 2: Issue - The submitted Traffic Report addresses the traffic flows within the site to
        ensure there is no hindrance to vehicles entering/leaving the site. However, concerns are
        raised around traffic management when there is fuel delivery and refilling in operation,
        including the impact on the parking spaces near the entry/exit.

        Information Required: Provide traffic management plan/procedure to demonstrate that the
        refuelling operation will not impact on the traffic movement on the site and in Eumundi Noosa
        Road, the plan should include but not limited to the following:
                 (a) the fuel filling points and the standing location of the delivery truck
                 (b) the number and locations of bowsers to be closed during the fuelling process
                 (c) the temporary signage and traffic control measures during fuelling
                 (d) any proposed time restriction/s for fuel deliveries

Response: The filling point for the proposal is located adjacent to the southern bowser within the site,
as illustrated in Figure 2. It is proposed that the delivery truck will stand adjacent to the fill points and
maintain sufficient space to allow customer access and circulation through the site. Due to this
arrangement the two southern bowsers will be closed during the refuelling operation. Traffic cones will
be utilised to ensure the area is clear during the process.
A time restriction for deliveries has not been confirmed as of yet however, it is anticipated that fuel
deliveries will be undertaken outside peak times to maintain maximum turnover. This would also limit
the opportunity for reduced bowsers during peak times that may cause queuing back onto Eumundi
Noosa Road.
For further details please refer to Attachment C for the complete traffic response.
Log in to download the original file

1. Ltr_160923_BA4090_Response to Information Request.pdf · 833 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.