1. Ltr_160923_BA4090_Response to Information Request
Attached to the e-mail Response to Information Request - MCU16/0084 & OPW16/0157.
Figure 3 – On-Site Queuing & Manoeuvrability B99 Vehicle
Item 4: The Stormwater Management Plan Noosa Energy Centre – 140-142 Eumundi Noosa
Road, Noosaville For Denmac Nominees Pty Ltd Dated 14 July (Doc Ref: B16239CR002)
specifies for an above ground detention tank to be provided with three slow release orifice
pipes to control outflow. The Plans provided only show a schematic underground tank with no
orifices that match with the Stormwater Management Plan.
Information required: Provide updated design plans that are consistent with the The
Stormwater Management Plan Noosa Energy Centre – 140-142 Eumundi Noosa Road,
Noosaville For Denmac Nominees Pty Ltd Dated 14 July (Doc Ref: B16239CR002) or any
relevant updated to that document as a result if this information request.
Response: The stormwater management plans have been updated to illustrate the slow release
orifice arrangement located on an internal weir within the detention take to control the outflow. For
further details please refer to Attachment D for Lamberts & Rehbein complete response and updated
drawings. Drawing B16239-CSK02 illustrates the orifice arrangement.
Item 5: The plans propose for the detention tank to be buried beneath the shop. It is unclear
how the tank will be able to be accessed for repair or maintenance if needed.