Final Judgment - Court Order Approval MCU16/0153 REC16/0041

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

29.   All easements for public or third party infrastructure must be in accordance with the
      planning scheme and granted at no cost to the Grantee. Where the Grantee is Council
      or a service authority, the easement documentation must be in accordance with the
      Grantee’s standard easement terms. Draft easement documentation must be submitted
      to Council for endorsement.
30.   All works must be kept clear of any existing or proposed easements for public or third
      party infrastructure on the subject land, unless agreed otherwise in writing by the
      Grantee.
      Earthworks and Retaining Walls
31.   All earthworks and associated retaining structures/batters must be undertaken in
      accordance with an Operational Works approval, and contained entirely within the
      subject site unless written permission from the respective landowner(s) is provided to
      Council.
32.   Earthworks carried out on site must not affect the structural integrity of any of the existing
      buildings and/or services and/or structures and/or lands that border the development
      site.
      Damage to Services and Assets
33.   Any damage caused to existing services and assets as a result of the development
      works must be repaired at no cost to the asset owner at the following times:
      (a)   where the damage would cause a hazard to pedestrian or vehicle safety,
            immediately; or
      (b)   where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.
      Outdoor Lighting
34.   Any outdoor lighting with the potential to affect surrounding residential premises shall be
      designed, installed, operated and maintained in accordance with AS4282 “The Control
      of the Obtrusive effects of Outdoor Lighting”.
      Fencing and Walls
35.   Any street fencing to David Low way or Sandpiper Court must be set back an average
      of 1 metre from the front property boundary. Any fencing on the front boundary must
      either:
      (a)   not exceed a maximum height of 1.2m;
      (b)   be of open construction..
      Street Identification
36.   The street address of the development must be clearly visible and discernible from the
      primary frontage of the site by the provision of a street number and, where appropriate,
      the building name.
      Clothes Drying Areas
37.   Each dwelling unit in Stage 2 must be provided with access to an outdoor clothes line
      which is screened from public view.




                                          Page 10 of 46

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Final Judgment - Court Order Approval MCU16_0153 REC16_0041.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.