Skip to the record
The only place to find full transcripts.

Council archive · source document

Final Judgment - Court Order Approval MCU16/0153 REC16/0041

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                  summary contained within that document to confirm free draining outlets,
                  within reasonable construction tolerance capabilities are achieved; and
            (v)   presentation of groundwater testing results which demonstrate that all parts
                  of the treatment measures are located above seasonal high groundwater
                  levels.
            A copy of the detailed civil drawings for the bio-retention system must be included
            as an appendix to the plan.
      (i)   The plan must include a comprehensive Maintenance Plan for the detention tank
            and the bioretention system including the frequency of cleanout, methods of
            cleanout, and general maintenance. The plan will include the requirement for
            regular inspections and the keeping of records (to be maintained and made
            available to Council upon request). The plan is also to stipulate that all necessary
            improvements are required to be made immediately upon awareness of any
            deficiencies in the treatment measure/s. The detention tank is to be capped and
            trafficable.
      (j)   The plan shall include details of the costs of maintenance (including periodic
            replacement of filter media) over the life of the asset.
23.   The Maintenance Plan (including costing) must be included in any Community
      Management Statement for the site.
24.   The Body Corporate for the site must enter into a contract with a suitably qualified
      contractor(s) for the maintenance of the stormwater quantity and quality devices and
      provide evidence of both the contract and execution of the contract upon request by
      Council.
25.   Prior to the commencement of use, certification is to be submitted to Council from a
      suitably qualified stormwater quality specialist to verify that the bioretention works have
      been constructed generally in accordance with the approved civil works plans,
      conditions of approval and relevant sections of the Construction and Establishment
      Guidelines: Swales, Bioretention Systems and Wetlands (SEQ Healthy Waterways
      Partnership). Council approval of the constructed stormwater management system is
      required prior to commencement of use.
26.   Certification is required to include all relevant items noted in Construction and
      Establishment Guidelines: Swales, Bioretention Systems and Wetlands (SEQ Healthy
      Waterways Partnership) including completed and signed forms.
      Acid Sulfate Soils
27.   The application for operation works must include an Acid Sulfate Soil and Groundwater
      Management Plan for the development prepared by a suitably qualified person and in
      accordance with relevant State Government Policy and Guidance material to prevent
      any impact to the receiving environment as a result of development within actual or
      potential acid sulfate soils, and associated groundwater impacts. Detail design plans
      provided with the application for operation works approval must demonstrate how the
      bedding surrounding underground pipework will be managed to prevent continual
      dewatering of groundwaters along it to the receiving environment, and how any impacts
      to groundwater from proposed filling on potential or actual acid sulfate soils will be
      managed.
      Easements
28.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.




                                          Page 9 of 46

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Final Judgment - Court Order Approval MCU16_0153 REC16_0041.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.