Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Final Judgment - Court Order Approval MCU16/0153 REC16/0041

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

            (viii) air quality protection;
            (ix)    storage and handling of hazardous substances;
            (x)     noise and vibration management;
            (xi)    waste management;
            (xii) cultural heritage management;
            (xiii) visual amenity protection;
      (e)   In particular, but without limitation, the EMP shall address the following issues in
            relation to the operational phase:
            (i)     legislative compliance;
            (ii)    water conservation;
            (iii)   water quality protection;
            (iv)    maintenance of Stormwater Quality Improvement Devices
            (v)     vegetation protection;
            (vi)    fauna protection;
            (vii) bushfire control;
            (viii) weed and pest control;
            (ix)    biting insects management
            (x)     waste management.
50.   The EMP shall be submitted to Council prior to or in conjunction with the lodgement of
      any development applications for Operational Works for the Site. Operational Works
      approval shall not be granted until the EMP is approved by the Coordinator of
      Environment and Landscape. The Developer shall comply with the requirements of the
      EMP.
Building Demolition/Removal/Relocation
51.   Where the development involves the removal, relocation or demolition of a building, a
      Waste Management Plan (construction and demolition) shall be submitted and approved
      by Council’s Environmental Health Officer prior to issue of a development permit for
      operational works for demolition, removal or relocation of any building other than a shed.
      The purpose of the Waste Management Plan is to facilitate the segregation of waste for
      the effective reuse and recycling of such materials. Segregated wastes attract
      significantly reduced disposal fees at the landfill with some items free. Higher gate fees
      are charged for mixed waste.
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable
      and waste materials. These shall be located so that they are convenient and safe to use.
      The Plan shall contain the following information:
      (a)   The site area for the storage and separation of waste is to be shown on the plan
            drawings accompanying the application.
      (b)   A waste management table as indicated below is to be completed showing how
            waste material is to be segregated - recycled – reused or disposed.
      (c)   Table – Waste Management Table.




                                             Page 14 of 46

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Final Judgment - Court Order Approval MCU16_0153 REC16_0041.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.