Final Judgment - Court Order Approval MCU16/0153 REC16/0041

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

        MATERIALS ON-SITE                                          DESTINATION
                                                      Re-use and Recycling                    Disposal
        Expected waste       Estimated      On-site              Off-site                *specify contractor
        materials            volume(m³)     *specify proposed *specify contractor        and landfill site or
                                            re-use or on-site and recycling outlet       other disposal site
                                            recycling methods
        Excavation
        material
        Green waste
        Bricks
        Concrete
        Timber-please
        specify
        Plasterboard
        Metals - please
        specify
        Asbestos
        Other - please
        specify
      Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
      completed by the demolition contractor.
Waste Storage
52.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy 9, Waste Management, including an external imperviously
      paved area correctly sized for all refuse and recycling containers and suitably screened
      from public places and neighbouring properties.
53.   A bin wash area is required with a cold-water tap, hose and drain outlet connected to
      sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry
      to the sewerage system which can be achieved by a bunded area, with a nib wall height
      of 100mm maximum, enclosing a wash area of 700mm x 700mm minimum (max 0.7m²).
      Alternatively, the waste area can be roofed, or any other appropriate design approved
      by Council.
Noise
54.   Upgraded building envelope constructions and the provision of mechanical
      ventilation/air conditioning which achieves the ventilation requirements of the Building
      Code of Australia, in accordance with the Second Joint Report of Experts in Noise (30
      May 2018) for Planning and Environment Court Appeal 4066 of 2017, including:
      (a)   the facades of the Visitor accommodation Type 4 motel building facing towards
            the IGA building and IGA carparking area;
      (b)   the facades of the Visitor accommodation Type 4 dwelling units facing towards the
            IGA building; and
      (c)   the facades of the Visitor accommodation Type 4 dwelling units facing towards the
            hotel building, drive-through access road and drive-through bottleshop, and
            carparking areas.
55.   Prior to the commencement of use written certification is required from a suitably
      qualified person confirming that upgrades to the building facades and provision of
      mechanical ventilation/air conditioning comply with the recommendations of the Second
      Joint Report of Experts in Noise (30 May 2018) for Planning and Environment Court
      Appeal 4066 of 2017.




                                           Page 15 of 46

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Final Judgment - Court Order Approval MCU16_0153 REC16_0041.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.