Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Final Judgment - Court Order Approval MCU16/0153 REC16/0041

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

      must be registered against the titles of the properties in favour of the relevant authority
      and/or property over the land area on the subject site.
68.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.
69.   All easements must be designed in accordance with the planning scheme and granted
      at no cost to the Grantee. Where the Grantee is Council or a service authority, the
      easement documentation must be in accordance with the Grantee’s standard easement
      terms. Draft easement documentation must be submitted to Council for endorsement.
      Electricity and Telecommunication Services
70.   Reticulated electricity and telecommunication services must be provided to each lot in
      accordance with the standards and requirements of the relevant service provider.
71.   Unless otherwise stipulated by telecommunications legislation at the time of
      construction, the development must be provided with all necessary conduits, pits and
      pipes to accommodate the future connection of optic fibre technology
      telecommunications.
72.   Certification must be submitted to Council from all relevant service providers which
      certifies that the development has met the requirements of this Decision Notice and all
      applicable legislation at the time of construction.


ADVISORY NOTES:
      Building and Construction Industry (Portable Long Service Leave) Levy
73.   The QLeave levy must be paid prior to the issue of a development permit where it is
      required. Council will not be able to issue a Decision Notice without receipt of details
      that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
      6855.
      Co-ordination of Operational Works Assessment
74.   Additional application fees apply to Operational Work applications where the different
      aspects of the works are lodged separately. Significant savings in application fees will
      result if all works are lodged in a single application.
      Preparation of a Preliminary Construction Management Plan
75.   A preliminary Construction Management Plan must be submitted with the Operational
      Works application and must address the following:
      (a)   traffic management during all aspects of the construction phase including:
            (i)     a Traffic Management Control Plan in accordance with the Manual of
                    Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                    and traffic control measures prior to construction.
            (ii)    maintenance of safe pedestrian access for the areas affected by the works
                    during and after daily construction has ceased.
            (iii)   proposed fencing to the site during the construction phase of the
                    development.
            (iv)    approval of the Traffic Management Control Plan by the Department of
                    Transport and Main Roads (DTMR) for any works on State controlled roads.
            (v)     provision for worker car parking.




                                          Page 18 of 46

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Final Judgment - Court Order Approval MCU16_0153 REC16_0041.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.