Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Final Judgment - Court Order Approval MCU16/0153 REC16/0041

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

      (d)   maintenance and protection of water quality and existing drainage lines through
            the construction site, through the implementation of appropriate erosion and
            sediment control measures.
      (e)   works programme identifying key components of the works and their respective
            durations.
      (f)   establishment of a communication protocol with the general public, adjoining
            owners, emergency services and local businesses to advise of agreed
            construction times, impacts on traffic, services and other relevant issues.
      (g)   identification of complaint management procedures including:
            (i)    contact details for the on-site manager;
            (ii)   dispute resolution procedures.
      (h)   details on the location of external fill sites/sources, the haulage route, type of
            vehicle to be utilised during filling operations and frequency of usage. NB any
            damage to the existing road system as a result of haulage operations shall be fully
            repaired at the applicant’s expense.
      (i)   it is acknowledged that the preliminary Construction Management Plan will be a
            draft document requiring finalisation upon appointment of the Principal Contractor
            employed to construct the works and a final document will be required to be
            submitted at the Pre-Start Meeting for the project.
      Private Infrastructure
76.   All private infrastructure for the development must be designed to meet the planning
      scheme requirements unless otherwise agreed by the relevant authority.
77.   For the purpose of preparing a Landscape Plan, a qualified person is considered to be
      a landscape architect, landscape designer and/or horticulturist with a minimum of 3
      years current experience in the field of landscape design.
78.   For the purpose of preparing a Fauna Management Plan, a qualified person is
      considered to be an ecologist with a minimum of 3 years current experience in the field
      of fauna assessment and management.
79.   For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
      with the bushfire requirements of this Decision Notice, a qualified person is considered
      to be an ecologist with a minimum of 3 years current experience in the field of bushfire
      assessment and management.
80.   For the purpose of preparing a Hydrological plan, and for certifying compliance with the
      hydrological requirements of this Decision Notice, a qualified person is considered to be
      a hydrologist with a minimum of 3 years current experience in the field of hydrological
      assessment and management.
      Infrastructure Charges
81.   This Development Permit will not trigger an “Infrastructure Charge Notice” to be issued
      in accordance with Council’s “Charges Resolution” made pursuant to the planning
      legislation and regulations current at the time of issue.
ENVIRONMENTAL HEALTH ADVICE
      Building Works
82.   Noise from residential building works shall comply with the following:
      (a)   Limited to between 6:30am to 6:30pm Monday to Saturday.
      (b)   All reasonable measures are taken to minimise noise emissions




                                         Page 19 of 46

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Final Judgment - Court Order Approval MCU16_0153 REC16_0041.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.