Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Stormwater Management Plan

of 42

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

7 > Conclusion

This Stormwater Management Plan demonstrates that under the proposed concept plan Stormwater
Quality and Quantity Treatment is achievable to the levels required by State Planning Policy July 2017.

Noosa Shire Council flood mapping indicates the site is not subject to flooding from any source.

The lawful point of discharge for the site is to the existing underground stormwater drainage network in
Bottlebrush Avenue.

Stormwater and roofwater runoff from the development will be collected and conveyed in a new
stormwater pit and pipe network to an underground detention tank located near the south-western side
of the site. Detained flows from the tank will outlet to a new stormwater manhole in Bottlebrush Avenue
located at opposite verge of road.

Stormwater Treatment will not be required as part of the development in accordance with the Noosa
Shire Council planning Scheme Policy and State Planning Policy July 2017.

A Trapezoidal catch drain will be constructed along the north-eastern boundary to collect and convey
upstream catchment runoff. This runoff will be collected in a stormwater pit at the eastern end of the
catch drain and conveyed through the internal drainage system.



8 > Limitations of Report

MPN have prepared this report in support of the proposed multi-residential development at 23
Bottlebrush Avenue, Noosa Head. This report is provided for the exclusive use of John Haines for this
specific project and its requirements. It should not be used by or relied upon by a third party and MPN
accepts no responsibility for the use of this report by any party other than John Haines.




                                                                                                                                         16
Inspired engineering

22 May 2025
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/10000-10999/10200-10299/10256/Report/22-05-25 SWMP_Issue A.docx

Log in to download the original (Stormwater Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.